Annual General Meeting Presentation
Released
Released
Announcement PDF
ANNUAL GENERAL
MEETING PRESENTATION
28 MAY 2024
www.cypriummetals.com
DISCLAIMERS AND FORWARD-LOOKING STATEMENTS
IMPORTANT: You must read the following before continuing.
This Shareholder Update Presentation (“Presentation”) has been prepared by Cyprium Metals Limited (ABN 48 002 678 640) (“Cyprium” or “Company”) and authorised for release to ASX by the Board of Directors.
Summary information
By reviewing or retaining these materials, or attending or participating in this Presentation, you acknowledge and represent that you have read, understood and accepted the terms of this “Important Notices and Disclaimer”. This Presentation contains summary information
about Cyprium, and its activities current only at the date of this Presentation. This Presentation is for information purposes only. The information in the Presentation is of a general nature only and does not purport to be complete. This Presentation should be read in conjunction
with Cyprium’s most recent financial report and other periodic and continuous disclosure announcements lodged with the Australian Securities Exchange (“ASX”) which are available at www.asx.com.au and also available on Cyprium’s website at www.cypriummetals.com.
Certain information in this Presentation has been sourced from Metals X Limited, the former owner of Paterson and their representatives or associates. While steps have been taken to review that information, no representation or warranty, expressed or implied, is made as to its
fairness, correctness, completeness or accuracy. Certain information in this Presentation may have been obtained from research, surveys or studies conducted by third parties, including industry or general publications. Neither Cyprium nor its representatives have
independently verified any such information sourced from third parties or industry or general publications.
Not an offer
This Presentation is for information purposes and is not, and does not purport to be, a prospectus, product disclosure statement or any other offering document under Australian law or the law of any other jurisdiction (and will not be lodged with the Australian Securities and
Investments Commission (“ASIC”) or any foreign regulator). The information does not and will not constitute or form part of an offer, invitation, solicitation or recommendation in relation to the subscription, purchase or sale of securities in any jurisdiction and neither this
Presentation nor anything in it shall form any part of any contract for the acquisition of Cyprium shares. The distribution of this Presentation in jurisdictions outside Australia may be restricted by law and you should observe any such restrictions.
Not investment or financial product advice
This Presentation does not constitute financial product, investment, legal, taxation, accounting or other advice and is not intended to be used or relied upon as the basis for making an investment decision. This Presentation is not a recommendation by Cyprium or its advisers to
acquire Cyprium shares or New Shares. This Presentation has been prepared without taking into account the objectives, financial situation or needs of individuals. Before making an investment decision, prospective investors should consider the appropriateness of the
information having regard to their own objectives, financial situation and needs and seek financial, legal and taxation advice appropriate to their jurisdiction. Cyprium is not licensed to provide financial product advice in respect of Cyprium shares.
Effect of rounding
A number of figures, amounts, percentages, estimates, calculations of value and fractions in this Presentation are subject to the effect of rounding. Accordingly, the actual calculation of these figures may differ from the figures set out in this Presentation.
Past performance
Past performance information, including past share price performance of Cyprium and pro forma financial information, given in this Presentation is given for illustrative purposes only and should not be relied upon as (and is not) an indication of Cyprium’s (or anyone else’s) views
on Cyprium’s future financial performance or condition. Past performance of Cyprium cannot be relied upon as an indicator of (and provides no guidance as to) the future performance of Cyprium. Nothing contained in this Presentation nor any information made available to you
is, or shall be relied upon as a promise, representation, warranty or guarantee, whether as to the past, present or future.
Forward-looking statements
This Presentation contains certain “forward-looking statements” and comments about future events, including statements regarding Cyprium’s intent, belief or current expectations with respect to the Company’s business and operations, market conditions, results of operations
and financial condition, and risk management practices. The words “likely”, “expect”, “aim”, “should”, “could”, “may”, “anticipate”, “predict”, “believe”, “plan”, “estimate”, “will”, “believe”, “target” and other similar expressions are intended to identify forward-looking
statements. Indications of, and guidance outlook on, future earnings or financial position or performance are also forward-looking statements and include statements in this Presentation regarding the conduct and the future performance of Cyprium.
Forward-looking statements are provided as a general guide only and should not be relied upon as an indication or guarantee of future performance. Actual results, performance or achievements may differ materially from those expressed or implied in such statements and any
projections and assumption on which these statements are based. These statements may assume the success of Cyprium’s business strategies. The success of any of those strategies will be realised in the period for which the forward-looking statement may have been
prepared or otherwise. Recipients of this Presentation are cautioned not to place undue reliance on forward-looking statements, and except as required by law or regulation, none of Cyprium, its representatives or advisers assumes any obligation to update these forward-looking
statements. No representation or warranty, express or implied, is made as to the accuracy, likelihood of achievement or reasonableness of any forecasts, prospects, returns or statements in relation to future matters contained in this Presentation. The forward-looking statements
are based on information available to Cyprium as at the date of this Presentation. Except as required by law or regulation (including the ASX Listing Rules), none of Cyprium, its representatives or advisers undertakes any obligation to provide any additional or updated
information whether as a result of a change in expectations or assumptions, new information, future events or results or otherwise. Indications of, and guidance or outlook on, future earnings or financial position or performance are also forward-looking statements.
Cautionary Statements
This document contains information from the Nifty Scoping Study. The Scoping Study was undertaken for the purposes of demonstrating the business case to support the recommencement of surface mining and copper concentrator operations at the Nifty Copper Operation. It
is a preliminary technical and economic study of the potential viability of the Nifty Copper Operation. It is based on low-level technical and economic assessments that are not sufficient to support the estimation of ore reserves. A level of accuracy of +/-30% is applicable in
accordance with Scoping level accuracy. Further evaluation work and appropriate studies are required before Cyprium will be in a position to estimate any ore reserves or to provide any assurance of an economic development case. The project economics in this Study are
derived solely from the mining and processing of Measured and Indicated Mineral Resources. The small amount of Inferred Mineral Resources mined is treated as mineralised waste and does not contribute to the project economics. The Scoping Study is based on the material
assumptions as detailed in the ASX announcement dated 23/5/24.
References to Mineral Resources
The information in this announcement that relates to Mineral Resources for Nifty was previously reported by the Company in its announcement dated 14 March 2024. The Company confirms that it is not aware of any new information or data that materially affects the information
included in those market announcements and, in the case of Mineral Resources, all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed. The Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market announcement.
2
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
ACKNOWLEDGEMENT OF COUNTRY
Cyprium recognises and respects the Traditional Custodians of the lands
where we conduct our business. We acknowledge the profound spiritual
and cultural significance these lands hold for their ancestral owners.
We are committed to fostering enduring relationships with indigenous
communities, recognizing our shared obligation to protect and cherish
the land, waters and heritage for generations to come.
3
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
SIMPLE EXECUTION STORY
Large scale copper resource, low risk project re-start
§
We are very focused on delivering the “next logical steps” to create shareholder value
§
Low complexity restart of heap leach mine can generate meaningful revenues in 2025
§
Large truck-shovel surface mine at Nifty can produce 36ktpa for 15+ years
–
Lowest capital-intensity “new” copper tonnes in Australia
–
Top 10 scale copper mine in Australia1
§
We will address our current balance sheet as a part of our transition to operations
4
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
Notes
1. Based on 2023 annual production estimates from all producing Australian copper mines. Data from S&P Global
CYPRIUM METALS (ASX:CYM) – AT A GLANCE
Share Price
$0.041
Shares on issue
1,525m
Market Value
$62.5m
Cash
$13.5m
Secured debt
$15.5m
Convertible notes1
$36.0m
Enterprise Value
$100.5m
Share Trading History – Last 12 Months
0.12
Governance Team
Trading suspended
0.10
0.08
0.06
3.0
Gary Comb
Non-Exec Director
Scott Perry
Non-Exec Director
David Hwang
Corporate Secretary
Dollar Volume
May-24
Apr-24
Mar-24
Feb-24
Jan-24
Dec-23
Nov-23
Oct-23
0.0
Sep-23
$18.8m
0.00
Aug-23
Available capital resources4
Non-Exec Director
0.5
Jul-23
$90.5m
Ross Bhappu
1.0
Jun-23
Enterprise Value, fully diluted3
3.5
1.5
0.04
May-23
$81.8m
Exec Chairman
2.0
572m
Market Value, fully diluted
Matt Fifield
2.5
0.02
Options, warrants, rights2
4.0
Shares Traded ($ m.)
23 May 2024
Share Price ($)
ASX: CYM
Corporate Team
Matt Fifield
Exec Chairman
Milan Jerkovic
COO
Manu Trivedi
CFO
John Gardner
IR and Media Advisor
Price
Technical Team
Top Owners (As of 31 March 2024)
On Issue
Trading Liquidity
1-Mar
23-May
Gavin Hammer
GM – Nifty
Flatfooted
10.0%
30-day ADTV
$30k
$556k
Bernard Etschmann
Process Engineer
Paradice
7.8%
90-day ADTV
$41k
$244k
Peter Van Luyt
Chief Geologist
Pacific Road Capital1
7.2%
Mark Styles
Exploration Geologist
CI Global Asset Mgmt
6.2%
Chris Marissen
Mining Engineer
All institutional
50.7%
All directors/insiders1
19.7%
1. Pacific Road Capital is an affiliate of Matt Fifield who is also an
insider.
5
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
Balance sheet information as of 31 March 2024.
1. Convertible Notes due 31 March 2025 are convertible at holder’s option and with an effective conversion price of $0.335 per share are counted as debt in calculation of enterprise value.
2. Options with $0.06 strike price expire 31 Dec 2024; Sr Debt Warrants with $0.048 strike price expire 13 Sep 2025; 68 million performance rights have variable target-based vesting thresholds.
3. Includes cash effect of $29m from exercise of all options, warrants and rights.
4. Cash on hand plus available capital from debt facilities. Excludes any cash from exercise of options or warrants.
CYM DEVELOPMENT STRATEGY
Cathode in 2025, concentrate in 2027 and organic growth beyond
HIGH
Project
execution
Nifty
SX-EW
Restart
Design /
feasibility
Project
Knowledge
Baseline
Nifty Copper
Large Surface Mine
Conceptual
plans
Maroochydore
MEDIUM
Murchison
Assets
Resource
delineation
Near
Nifty
Greenfield
exploration
Paterson
Exploration JV
LOW
NOW
6
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
1Y
3Y
Catalyst required
Longer term
NIFTY: A PROLIFIC PRODUCER IN TIER 1 LOCATION
A high-quality copper mine
Proven Producer
Brownfield Re-start
§ Nifty produced 750 kt of copper over 24 years
§ Oxidised copper ores were treated via SX/EW plant
to produce copper cathodes
§ Sulphide ore was processed in the Nifty concentrator
with an average copper recovery of 92% to
concentrate1
§ Existing site infrastructure provides an excellent
platform for an expedited re-start to copper cathode
production
§ Site power, water, airstrip, accommodation camp and
access roads are fit for purpose for a re-start to
copper cathode production
§ CYM plans to treat the same Nifty ore using the same
processing plants
7
Predictable Sedimentary Copper
Low Risk Jurisdiction
§ Nifty is located in the Paterson province which hosts
some of Australia’s largest base and precious metals
projects
§ Nifty hosts 1Mt of contained copper sulphides in the
Measured and Indicated Resource categories2
§ Near-mine extensions of Nifty are priority exploration
targets
§ Western Australian location gives access to best-inclass partners, labour, suppliers.
§ Nifty is on a permitted mine site. CYM has made the
necessary submission to DEMIRS with updated
mining plans
§ Community engagement program started for the
Nifty mining areas
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
Notes
1. Based on available plant data from 2011 to 2019
2. See cautionary statements in relation to Mineral Resources
NEAR TERM COPPER CATHODE PRODUCTION
Copper cathode production at Nifty is the first phase of mining operations
Simple operating plan on retreatment
Nifty Heap Leach Pads
§ Existing heaps were built up in 3m layers
§ Heaps are turned over by small excavator in
3m lifts to refresh surface areas, then
re-leached
§ Copper-rich solution is recovered through
existing gravity drainage system and sent
to ponds, then plant
§ Depleted material is stripped and removed
§ The process is repeated for layers below
Target Production of 5-6,000 tpa
§ There is a significant body of work from prior studies that
underpins the mineral inventory and recovery profiles
§ Existing infrastructure is capable of producing in the range of
10ktpa
§ We are targeting a conservative production profile to establish
production
Low complexity plan designed to maximize speed to market and minimize capital requirements
8
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
NIFTY, SURFACE MINE SCOPING STUDY
The scoping study delivered robust economics from a 17 year surface mining operation
Operational Metrics1
Wireframe of Nifty Mineral Resource with Open-Pit Shell
Mine life
17 years
Mine and plant throughput
4.5 Mtpa
Ore mined and processed (LOM)
70 Mt
Strip ratio
9.7x
Average copper grade
0.9%
Metallurgical recovery (LOM average)
90%
Copper concentrate produced
36 ktpa / 570 kt (LOM)
Financial Metrics1,2,3,4
Copper price (A$/t)
13,000
Revenue (A$ m.)
7,400
Operating costs (A$ m.)
4,700
EBITDA (A$ m.)
2,700
Capital expenditure (A$ m.)
175
Undiscounted free cashflow (A$ m.)
2,525
NPV (8%) (contractor model) (A$ m.)
880
IRR %
46%
9
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
RESOURCE >
0.25%Cu
MEASURED
INDICATED
INFERRED
Notes
1. Scoping Study estimates were produced by independent consultants MEC Mining Group Pty Ltd (MEC). See ASX announcement dated 23/5/24 for detailed disclosure of scoping study assumptions.
2. Financials are on a project basis and do not include CYM corporate costs.
3. Financials are presented on a real 2024 basis with no inflation applied and on a pre-financing basis.
4. Financial estimates account for project royalties but no corporate tax.
TRUCK SHOVEL OPERATIONS FOR 36,000 TONNES CU
3x 600-tonne excavators an ideal match for 4.5 mtpa ore feed to plant
Large volume optimized pit leads to larger truck-shovel operations for
best mine life and production profile trade off
LOM Copper Produced in Concentrate
50,000
§ Reviewed throughput rates from 2.8 Mtpa to 6.0 Mtpa
45,000
§ Ideal throughput rate of 4.5 Mtpa was selected
§ Average annual production of copper in concentrate is around 36 ktpa
§ Waste haulage optimization
§ Alternate fuels for lower costs and carbon foot-prints
§ Pre-strip scenarios
Copper Produced in Concentrate (dmt)
PFS will include additional work around lowering effective mining
costs and strip ratios
40,000
35,000
30,000
25,000
20,000
15,000
10,000
5,000
0
Y1
10
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
Y2
Y3
Y4
Y5
Y6
Y7
Y8
Y9
Y10
Y11
Y12
Y13
Y14
Y15
Y16
Y17
RE-START ADVANTAGED BY EXISTING INFRASTRUCTURE
Modest pre-production capital is required for the re-start and expansion of sulphide concentrator
Nifty Processing Facility
Re-start and expand concentrator
§ The Nifty sulphide processing plant ran for 15 years
producing clean and high-grade copper concentrates
§ Addition of mill and crushing gives plant required capacity to
match with ideal truck-shovel combination
§ A modest pre-production capital expenditure of $175 million
is estimated
Scoping Study Pre-Production Capital Costs (A$m.)1
Refurbishment of plant
35
ROM pad
3
Crusher
34
Primary Crushed Stockpile
10
Ball Mill
17
Reagent System
1
Float Cells
Thickener
15
Filter
5
Camp and office upgrades
34
EPCM and contingency
17
Total
175
11
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
5
Notes
1. Scoping Study estimates were produced by independent consultants MEC Mining Group Pty Ltd (MEC). See ASX announcement dated 23/5/24 for detailed disclosure of scoping study assumptions.
FAMILIAR SCALE TO OTHER AUSTRALIAN MINES
Nifty surface mine is a medium scale truck-shovel operation
Nifty
Prominent Hill
Commodity
Copper
Copper - Gold
Location
Western Australia
South Australia
Mining Method
Open-pit
Open-pit / Underground
Project Study
Scoping Study (2024)
DFS (2006)
Mining Inventory
70 Mt at 0.9% Cu
79.2 Mt at 1% Cu and 0.6g/t Au
Ore Throughput
4.5 Mtpa
8 Mtpa
9.7 X
7.2 X
Mining Movement
250 BCM (LOM)
191 BCM (first 6 years)
Annual Production
36 ktpa of Cu
71-104 ktpa of Cu
Contractor
-
Theiss
Excavator
3 x 600 t
3 x 600 t
Trucks
18-29 x 230 t
20-30 X 230 t
A$ 175m
A$ 775m
Strip Ratio
Pre-production Capex
12
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
Notes
1. Information obtained from ASX announcements.
POTENTIAL TO BE A TOP AUSTRALIAN COPPER PRODUCER
36ktpa of copper production would place Nifty in great company
120
12
100
10
80
8
60
6
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
10
7
6
Eloise
Nova-Bollinger
Anthill
Mt Colin
Capricorn Copper
4
3
3
2
1
1
1
Rosebery
10
Red Dome
11
Deflector
17
Peak
18
Jaguar
28
Savannah
31
Osborne
36
Tritton
47
Golden Grove
77
DeGrussa
132
Northparkes
197
Cobar
213
Ernest Henry
2
Prominent Hill
20
Carrapateena
4
Mt Isa Copper
40
0
13
Nifty Surface Mine
copper production
range over LOM (36ktpa
average)2,3
Olympic Dam
Copper Production (kt)
2023 Annual Copper Production from Australian Mines1,2
Notes
1. Based on 2023 annual production estimates from all producing Australian copper mines. Data from S&P Global
2. Scoping Study estimates were produced by independent consultants MEC Mining Group Pty Ltd (MEC). See ASX announcement dated 23/5/24 for detailed disclosure of scoping study assumptions
3. Excludes Nifty copper cathode production
0
PRODUCTION SCALE WITH LOW CAPITAL INTENSITY
Nifty’s low capital intensity and IRR set it apart from other Australian pre-production copper projects
Capital Expenditure of Australian Pre-Production Copper Projects with a Project Study1,2
1,800
70.0
Pre-production Capital Expenditure
Copper Production
60.0
1,400
50.0
1,200
40.0
1,000
800
30.0
600
20.0
400
10.0
200
0
0.0
Caravel
Walford Creek
Hillside
Kalkaroo
Emmie Bluff
Jervois
Nifty
Study Stage
PFS (2022)
SS (2019)
DFS (2022)
PFS (2019)
SS (2024)
DFS (2022)
SS (2024)
Annual
Production
62ktpa Cu
20ktpa Cu
plus Co, Ag, Zn, Ni
42ktpa Cu
and 30kozpa Au
30ktpa Cu
and 72kozpa Au
25ktpa Cu
plus Co, Ag, Zn
25ktpa Cu
36ktpa Cu
Capex (AUD)
$1.7 bn.
$996 m.
$854 m.
$332 m.
$306 m.
$298 m.
$175 m.
15%
13%
19%
26%
27%
21%
46%
IRR
14
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
Notes
1. Peer group defined as all Australian copper development projects with a project study and at least 200kt of contained copper in Mineral Resources.
2. Information derived from ASX Company Announcements.
Copper Production (ktpa)
Pre-production Capital Expenditure (A$m.)
1,600
LEVERAGED BALANCE SHEET
CYM is working to address its short-term liabilities and fund the Copper Cathode Project
Current situation1,2,3,4
§
§
§
$51.5 million in principal and interest payments are current
CYM has $13.5 million of cash available
$29 million of cash from options and warrants if exercised
CYM plans to address its balance sheet alongside funding for the
Copper Cathode Project
§
§
CYM has multiple options available to address required funding including:
equity, debt, joint ventures, offtake financing, royalties, contractor financing,
equipment financing and hybrid financing structures
CYM is engaged in discussions with potential financiers
Notes
1. Balance sheet information as of 31 March 2024.
2. Convertible Notes due 31 March 2025 are convertible at holder’s option and with an effective conversion price of $0.335 per share
3. Options with $0.06 strike price expire 31 Dec 2024; Sr Debt Warrants with $0.048 strike price expire 13 Sep 2025; 68 million
performance rights have variable target-based vesting thresholds.
4. Cash effect of $29m from exercise of all options, warrants and rights.
15
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
Short Term Liabilities1,2
Secured debt
$15.5 m
Convertible notes
$36.0 m
Total
$51.5 m
DEVELOPING OUR ESG FRAMEWORKS
We are committed to delivering materials that the world needs in the best
possible way.
Our ESG policy and framework are in development, and we acknowledge
our responsibility to our stakeholders, partners, customers and
employees to act with ethics and integrity at every point, and follow or
exceed best practices.
16
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
SIMPLE EXECUTION STORY
Large scale copper resource, low risk project re-start
§
We are very focused on delivering the “next logical steps” to create shareholder value
§
Low complexity restart of heap leach mine can generate meaningful revenues in 2025
§
Large truck-shovel surface mine at Nifty can produce 36ktpa for 15+ years
–
Lowest capital-intensity “new” copper tonnes in Australia
–
Top 10 scale copper mine in Australia1
§
We will address our current balance sheet as a part of our transition to operations
17
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
Notes
1. Based on 2023 annual production estimates from all producing Australian copper mines. Data from S&P Global
THANK YOU
Contact Us
Registered Office &
Principal Place of Business
Level 1, 437 Roberts Road
Subiaco WA 6008
Australia
Telephone
+61 8 6374 1550
www.cypriummetals.com
IMPORTANT NOTICES
Competent Person’s Statement
The information in this report that relates to estimation and reporting of Mineral Resource Estimates is an accurate representation of the available data and is based on information compiled by
external consultants and Mr. Peter van Luyt who is a member of the Australian Institute of Geoscientists (2582). Mr. van Luyt is the General Manager – Geology and Exploration for Cyprium
Metals Limited, in which he is also a shareholder. Mr. van Luyt has sufficient experience which is relevant to the styles of mineralisation and types of deposit under consideration and to the
activity which he is undertaking to qualify as a Competent Person (CP). Mr. van Luyt consents to the inclusion in the report of the matters based on his information in the form and context in
which it appears.
Calculation of Copper Equivalent
Copper equivalent grades have been calculated using an AUD/USD exchange rate of 0.63 and based on the following assumed metal prices: copper – AUD $15,049.89/t; gold – AUD
$3,568.55/oz; silver – AUD $40.38/oz; platinum – AUD $1,467.57/oz; palladium – AUD $1,465/oz; cobalt – AUD $40,361.54/t; nickel – AUD $28,763.51/t; zinc AUD $4,333.77/t.
The following formulae have been used to calculate copper equivalent grades, with results rounded to two decimal places:
• Nifty – MRE for the open pit and Mineral Inventory for the heap leach quote Cu only.
• Maroochydore – Cu-Eq grade (%) = Cu % + (Co % x 2.68) + (Zn % x 0.29).
• Hollandaire – Cu-Eq grade (%) = Cu % + (Au g/t x 0.76) + (Ag g/t x 0.01).
• Nanadie Well – Cu-Eq grade (%) = Cu % + (Au g/t x 0.76) + (Ag g/t x 0.01) + (Co % x 2.68) + (Ni % x 1.91) + (Zn % x 0.29).
Potential metallurgical recoveries can be estimated based on recoveries for similar deposit styles:
• Sediment-hosted deposits (Nifty, Maroochydore) – 85% Cu, 50% Co, 50% Zn.
• VMS deposits (Hollandaire) – 85% Cu, 70% Au, 50% Ag.
• Mafic-associated orthomagmatic sulphide deposits (Nanadie Well) – 90% Cu, 70% Pt, 70% Pd, 60% Au, 55% Ni, 55% Co, 50% Zn.
19
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
COPPER-FOCUSED RESOURCES IN PATERSON AND MURCHISON
Beyond Nifty, our copper-focused exploration portfolio will be a growth engine in the years to come.
• Paterson Province: Prospective ground for large sediment-hosted deposits
– Maroochydore: significant copper-cobalt resource proximate to Nifty
– IGO farm-in to 70% for $32 million on large tenement package
– “Near Nifty” = greenfield exploration within CYM’s state agreement
• Murchison Province: exploring for base metals in areas historically explored only for gold
– Nanadie Well: large tonnage orthomagmatic-hosted polymetallic resource
– Cue/Hollandaire: high-grade copper-gold-silver polymetallic resource and features recent Heeler hit
CYPRIUM METALS GLOBAL RESOURCES, COPPER-EQUIVALENT BASIS1
Property
Nifty
Measured and Indicated
Cu-Eq
Cont. Metal
Tonnes
Grade
kt Cu-Eq
Area
Tonnes
Inferred
Cu-Eq
Grade
Cont. Metal
kt Cu-Eq
Measured, Indicated & Inferred
Cu-Eq
Cont. Metal
Tonnes
Grade
kt Cu-Eq
Heap Leach
Open-Pit
118,970,000
0.85%
1,009,845
6,048,000
0.47%
28,381
125,018,000
0.83%
1,038,226
Maroochydore
Hollandaire
Nanadie Well
All
All
All
40,800,000
2,179,000
-
1.03%
2.29%
0.00%
420,537
49,848
-
7,830,000
605,000
40,400,000
1.50%
1.96%
0.56%
117,300
11,881
226,077
48,630,000
2,784,000
40,400,000
1.11%
2.22%
0.56%
537,837
61,729
226,077
Total
All
161,949,000
0.91%
1,480,230
54,883,000
0.70%
383,639
216,832,000
0.86%
1,863,868
1. Please see Important Notices which includes “Calculation of Copper Equivalent” and “Competent Person’s Statement”.
1.9 million tonnes of copper-equivalent resources in Western Australia
20
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
Residual Copper in Heaps
Cu-Eq
Cont. Metal
Tonnes
Grade
kt Cu-Eq
17,200,000
17,200,000
0.53%
-
90,935
-
-
-
0.53%
90,935
IMPORTANT NOTICES
Mineral Resource Estimates on which Cu equivalent calculations are based
MAROOCHYDORE MINERAL RESOURCE ESTIMATE 2013
Material type
Oxide
Sulphide
All material
Resource
Category
Indicated
Inferred
Volume m3
BD
Tonnes
Cu eq %
Cu eq T
Cu %
Cu T
Co ppm
Co T
Zn ppm
Zn T
18,561,818
1,073,636
2.2
2.2
40,836,000
2,362,000
1.03
0.94
420,265
22,146
0.92
0.81
375,691
19,132
388
451
15,844
1,065
174
227
7,105
536
Sub Total
19,635,455
2.2
43,198,000
1.02
442,411
0.91
394,823
391
16,910
177
7,642
Inferred
1,941,071
2.8
5,435,000
1.74
94,775
1.66
90,221
292
1,587
187
1,016
Sub Total
1,941,071
2.8
5,435,000
1.74
94,775
1.66
90,221
292
1,587
187
1,016
TOTAL
21,576,526
2.27
48,633,000
1.10
537,186
1.00
485,044
380
18,497
178
8,658
HOLLANDAIRE MINERAL RESOURCE ESTIMATE 2020
Material type
Resource
Category
Indicated
Volume m3
Tonnes
Cu eq %
Cu eq T
Cu %
Cu T
Au g/t
Au Oz
Ag g/t
Ag Oz
5,297
9,534
1.30
124
1.20
114
0.09
28
4.00
1,226
Transitional
Sub Total
Indicated
Inferred
5,297
94,984
4,266
9,534
274,768
12,081
1.30
2.03
0.42
124
5,567
51
1.20
1.80
0.40
114
4,946
48
0.09
0.24
0.02
28
2,120
8
4.00
5.00
1.00
1,226
44,170
388
Fresh
Sub Total
Indicated
Inferred
99,250
637,906
193,609
286,849
1,894,325
593,172
1.96
2.25
1.94
5,618
42,691
11,497
1.74
1.96
1.57
4,994
37,129
9,313
0.23
0.31
0.41
2,128
18,880
7,819
4.83
6.64
6.46
44,558
404,402
123,198
Sub Total
831,515
2,487,497
2.18
54,188
1.87
46,442
0.33
26,699
6.60
527,600
TOTAL
936,062
2,783,880
2.15
59,931
1.85
51,550
0.32
28,855
6.41
573,385
Oxide
All material
NANADIE WELL MINERAL RESOURCE ESTIMATE 2021
Resource
Category
Inferred
top cut
Total
21
Tonnes
Cu eq %
Cu eq T
Cu %
Cu T
Au g/t
Au Oz
Ag g/t
Ag kOz
Co ppm
Co T
Ni ppm
Ni T
Zn ppm
Zn T
1,300,000
200,000
Bulk
Density
2.8
2.9
3,500,000
600,000
0.63
0.63
21,976
3,803
0.44
0.45
15,400
2,700
0.12
0.12
13,503
2,315
0.70
1.50
79
29
70
60
245
36
350
310
1,225
186
160
140
560
84
Fresh
11,700,000
3.1
36,300,000
0.55
199,376
0.39
141,570
0.10
116,707
1.10
1,284
50
1,815
290
10,527
160
5,808
All material
13,200,000
3.1
40,400,000
0.56
225,587
0.40
161,600
0.10
129,889
1.00
1,299
50
2,020
290
11,716
160
6,464
Material type
Volume m3
Oxide
Transiti
Share your feedback