THREE KEY POINTS TO TAKE AWAY
Executing at speed to capitalize on asymmetric opportunity
1
Nifty, a former prolific producer currently at midlife, is a company-making asset with brownfield advantages of cost, time and scale
– Early shutdown of SXEW left an above-ground heap leach resource of 12.7Mt at 0.43% Cu with added potential from unclassified materials
– Closure and abandonment of high-grade underground mine left surface-mineable reserve of 83Mt at 0.9% Cu next to a 3.0Mtpa feed rate concentrator
– Continued investment over time maintained key permits and left serviceable camp, airstrip, infrastructure
– Two processing plants (cathode and concentrator) are fit for purpose and require refurbishment to operate
2
CYM are rapidly executing a very simple plan to bring Nifty back online
– Reprocess the heap leach pads for early cash flow
– Refurbish the concentrator, build new surface mine to access a 20+ year reserve
– Ultimately, expand to process material from other regional prospects including Maroochydore
– We are supported by best-in-class partners who are vested in our success
3
The market has radically mispriced this. CYM has a compelling risk-reward profile against all comparable valuation points
– Investors were hurt during Nifty’s “midlife crisis” as its high-grade underground operations came to an end
– CYM are “moving too fast”
– Investors not recognizing impact of current copper market on CYM’s opportunity set
The most asymmetric risk-reward to copper price on ASX?
2
CYPRIUM | MARCH 2025 INVESTOR PRESENTATION
CYPRIUM METALS SNAPSHOT (ASX: CYM)
CORPORATE SUMMARY1
CYM 12MTH SHARE PRICE CHART
0.06
Share Price
Market Capitalisation
A$ 0.017
A$ 35.1m
0.05
0.04
0.03
Cash (pro-forma)
Debt & Convertible Notes
A$ 25.0m
A$ 78.6m
0.02
0.01
NIFTY
Enterprise Value
A$ 88.7m
NIFTY COPPER COMPLEX
MAROOCHYDORE
MAJOR SHAREHOLDERS2
Flatfooted
Status
Next
JORC Resource
JORC Reserve
Development;
PFS complete;
Cathode Project
construction
1,038,000t
83Mt @ 0.90% Cu
for
Concentrate Project
BFS
91,000t
Paradice
19.9%
8.0%
Pacific Road Capital
CI Global Asset Management
7.1%
5.1%
Nokomis Capital
4.2%
Copper of
753,000t
copper in existing
leach pads
MAROOCHYDORE
Status
Deposit
Total JORC Resource
Higher-grade zone
Exploration
Large, near-surface
sulphide copper
371Mt @ 0.43% Cu
using a ≥0.25% Cu
Cutoff for
16Mt @ 0.67% Cu
using a ≥0.45% Cu
Cutoff for
1,595,000t
712,000t
contained Cu
contained Cu
1. Trading data at 17 March 2025. Glencore senior secured debt ($44.2m) at 31 December 2024. Convertible Notes ($34.4m) at 31 December 2024. Pro-forma cash balance comprises cash at 31 December 2024 ($14.2m), placement tranche 2 receipts ($8.3m), entitlement offer receipts ($1.5m) and further deposit received for sale of
surplus generators ($0.96m). Pro-forma cash is before costs incurred since 31 December 2024.
2. Major Shareholders interest at 28 February 2025. Pacific Road Capital is an affiliate of Matt Fifield who is also an insider.
3
CYPRIUM | MARCH 2025 INVESTOR PRESENTATION
PROVEN TEAM, POWERHOUSE PARTNERS
New management are major shareholders and strategically aligned
EXECUTIVE DIRECTORS & MANAGEMENT
MATT FIFIELD
LOUIS CHAIT
COLIN MACKEY
MANU TRIVEDI
• Deep-value investor-operator with track record of
company building and unlocking mispriced assets
• Former CFO and Asset Manager at Glencore Copper
• Seasoned mining leader with hands-on mine
construction and surface mine turnaround experience
• Chartered Accountant & CPA with 16 years in financial
leadership.
• Former MD of European Operations at Rio Tinto, Pacific
procurement lead, multiple mine GM roles
• Former Group Financial Controller at Masan Resources,
overseeing tungsten mining operations
Executive Chairman
Chief Commercial Officer
• Participated in 9 mine starts or restarts
• Multiple turnarounds, recapitalizations and mine financings
• Managing Director at Pacific Road Capital, a significant
shareholder of CYM
Chief Operating Officer
• Responsible for restructure of operating model,
commercial systems development, and execution of
significant cost savings initiatives
• Deep knowledge and network in copper
• Mine contracting with Theiss
• Significant financing experience
NON-EXECUTIVE DIRECTORS
STRATEGIC PARTNERS
ROSS BHAPPU
SCOTT PERRY
GARY COMB
• 35 years in mining investment & strategy,
specializing in private equity
• 25+ years of mining leadership with deep
financial and operational expertise
• 30+ years in base metal mine
development & operations
• Senior leader at Resource Capital Funds
since 2001
• Former President & CEO of Centerra Gold,
growing it into a C$3B global enterprise
• Private markets fundraising ~US$4.5B
• Former Board & Audit Committee Member,
World Gold Council (2015–2021)
• Former Chairman of Finders Resources &
MD of Jabiru Metals, leading project
execution & growth
Non-Executive Director
• Extensive board experience
4
Interim Chief Financial Officer
Non-Executive Director
CYPRIUM | MARCH 2025 INVESTOR PRESENTATION
Non-Executive Director
• Ex-CEO of BGC Contracting, overseeing
large-scale mining services
NIFTY IS A PROLIFIC OREBODY, CURRENTLY AT MIDLIFE
720,000 tonnes copper produced over 25 years – and at least that much more to go yet again
1995
2000
2005
2010
2015
2020
2025
WMC
Discover and
Build Cathode Ops
Straits
Expands SXEW
DFS on U/G mine
Hindalco / Aditya Birla
Builds U/G mine and sulphide concentrator
Shuts Cathode Ops
Metals X
CATHODE PRODUCTION = 220,000 TONNES / 485 MM LBS
U/G closes as grade falls &
Nifty sold
CYM
CONCENTRATE PRODUCTION = 500,000 TONNES / 1.1 BN LBS
Abandons U/G
PFS Cathode + O/P
2024 PFS: Open-pit reserve of 750,000 tonnes contained copper
5
CYPRIUM | MARCH 2025 INVESTOR PRESENTATION
ASSET-RICH BROWNFIELD SETS STAGE FOR RAPID RESTART
Unique opportunity to reposition a massive resource endowment through a change of mining method
2
83Mt reserve at 0.9% Cu for 750kt contained copper remains
in zone between the oxide open pit and the underground mine,
adjacent existing concentrator*
Underground workings
3
1
91,000 tonnes contained copper in above
ground stockpiles next to SX-EW plant1
Continued investment in site maintenance and compliance over time
has maintained suite of valuable permits, enabling fast redevelopment
Regulator
Current Status
Renewal /
Requirements
Works Approval
DWER
Approved
Aug-25
Native Veg. Clearing (3)
DEMIRS
Approved
Various
Mining Proposal
DEMIRS
Approved
MOP Update
Mine Closure Plan
DEMIRS
Approved
Apr-25
Water License
DWER
Approved
Apr-26
Permit
1. Copper contained in stockpiles accounted for by reconciliation of historical metallurgical accounting does not conform to JORC standards. A large portion of this material is deemed unclassified -- please refer to company
announcement “Nifty Heap Leach Mineral Resource Estimate” dated 19 August 2024 for additional information and further JORC resource and reserve figures on the following pages.
6
CYPRIUM | MARCH 2025 INVESTOR PRESENTATION
WE ARE EXECUTING A VERY SIMPLE PLAN AT PACE
2024 saw rebuild of information from first principles to develop forward action plan
2024
Nifty: Concentrate
2025
1Q
2Q
3Q
4Q
MRE
Concept
PFS Geotech
PFS
HL MRE
PFS
Nifty: Cathode
Permits/Entitlements
1Q
2Q
MAH feedback
on PFS
Cathode permit updates
Commercial / Partnerships
Glencore
MAH
Financial
Converts and
Senior Loan
Sell Non-core Assets
Current Workstream
• Onboarding of execution partner Macmahon
Key Upcoming Workstreams
• Updated Cathode Restart Plan
• Update existing permits for expected site activities
• Construction financing incl JV selldown
CYPRIUM | MARCH 2025 INVESTOR PRESENTATION
4Q
BFS
FS
• Finalise BFS scope for Concentrate Plan
and BFS initiation
7
3Q
Concentrate updates (MOP, Closure)
Mining Contracts
Construction Finance & JV Selldown
ABOVE GROUND COPPER IS STOCKPILED IN HEAP LEACH
Retreatment of existing leach pads is a low complexity, low capital path to cash flow
Drill holes data completed at partial depth determined block model
Metallurgical accounting:
17.2Mt material stacked contains 200 mmlbs of residual copper
12.4Mt JORC resource containing 119 mmlbs of copper and
10.6Mt JORC reserve containing 97 mmlbs of copper
4-year cathode PFS project life has potential to be significantly extended by conversion/upgrade of known additional above ground resource
8
CYPRIUM | MARCH 2025 INVESTOR PRESENTATION
1. Please refer to company announcements “Nifty Heap Leach Mineral Resource Estimate” dated 19 August 2024 and “Nifty PFS Confirms $1,129m Pre-Tax NPV and 797kt Ore Reserve” dated 25 November 2024
for additional information.
SXEW PLANT CAN BE QUICKLY AND INEXPENSIVELY REBUILT
Significant work to date shows low capital is required to refurbish plant for 6,000 ktpa operation
PFS Project Cost Estimate
Item
SX Plant (“Solvent Extraction”) requires new pumps,
motors, electrical and controls
Heap Leach
0.3
Mechanical
6.8
Electrical
6.5
Piping
3.4
Concrete & structural
2.8
Construction overheads
1.5
SX-EW Plant
21.0
Site, roads, misc
1.4
First fills
1.3
EPCM & Commissioning
2.5
Contingency
3.4
Total Capital Cost
29.9
Partial refurbishment of Electrowinning Circuit to operate
at 6,000 tpa, well below peak production of 25,000 tpa
PFS project plan being updated with execution partner Macmahon
9
CYPRIUM | MARCH 2025 INVESTOR PRESENTATION
A$m
1. Please refer to company announcement “Nifty PFS Confirms $1,129m Pre-Tax NPV and 797kt Ore Reserve” dated 25 November 2024 for additional information.
CATHODE PROJECT EXPECTED TO GENERATE EARLY CASH FLOW
Near-term exposure to spot copper price drives large potential upside from PFS Case, rapid payback puts upside on balance sheet
COPPER CATHODE PRODUCTION (KTPA) – PFS Case
LOM Cu cathode production – PFS Case
PRODUCTION (KT) & REVENUE (A$M) – PFS Case, PFS and Spot Pricing
24kt
A$6,800/t
US$2.18/lb
AISC
4.2 years
Project Life
Development capital
A$30m
Capitalised operating costs
A$16m
6.2
114
5.4
3.9
6.0
98
69
82
72
2.9
111
80
54
52
39
Year 1
Year 2
PFS (A$m)
Year 3
Spot (A$m)
Year 4
Year 5
Cu Cathode Plated (kt)
PRE-TAX FREE CASH FLOW (A$M) – PFS Case, PFS and Spot Pricing
65
63
53
Includes A$46m
project costs in
Year 1.
28
35
43
34
29
2
(14)
Year 1
PFS (A$m)
Year 2
Year 3
Year 4
Access to current copper price and FX environment would have material impact on short-term corporate cash
10
CYPRIUM | MARCH 2025 INVESTOR PRESENTATION
1. PFS pricing: Cu price US$4.25 / pound; AUD:USD $0.71.
2. Spot pricing (17 March 2025): CME Group copper futures curve 2025 – 2030, LT Cu price US$5.26 / pound; AUD:USD $0.63.
Spot (A$m)
Year 5
CONCENTRATE OPERATIONS – PFS MINE PLAN AT PFS AND SPOT
Significant positive exposure to forward copper prices
PRODUCTION & REVENUE – PFS Case, PFS and Spot Pricing
1,200
44
1,000
800
33
33
11
609
589
400
44
817
695
616
444
439
45
824
817
-
600
27
38
593
499
588
500
40
733
528
39
33
32
724
614
522
360
443
38
42
42
34
21
693
587
423
42
499
766
551
774
558
776
559
13
245
177
245
177
447
395
284
40 55
Y1
Y2
Y3
Y4
Y5
Y6
Y7
Y8
Y9
PFS (A$m)
Y10
Y11
Spot (A$m)
Y12
Y13
Y14
Y15
Y16
Y17
Y18
Y19
Cu Cathode Plated (kt)
Nifty’s reserve tail generates important long duration exposure to positive copper thematic = strategic
11
3
621
205
150
200
13
CYPRIUM | MARCH 2025 INVESTOR PRESENTATION
1. PFS pricing: Cu price US$4.25 / pound; AUD:USD $0.71.
2. Spot pricing (17 March 2025): CME Group copper futures curve 2025 – 2030, LT Cu price US$5.26 / pound; AUD:USD $0.63.
Y20
Y21
Y22
STRONG COPPER OUTLOOK OPENS UP FUNDING OPPORTUNITIES
Nifty’s advanced permitting and resulting near-term production profile, long life and low capital intensity are attractive to parties
seeking copper exposure
Minority
Joint Venturers
Strategic Finance
Royalty / Stream / Prepay
Asset-Infra
Description
•
Specialised credit seeking to
encourage supply chain
stability and support energy
transition
•
CYM has built in ability to sell
30% of offtake to interested
parties
•
Long-duration revenue interest
with ability to structure
•
Long-term tolling
arrangements
Participants
•
Government-backed lenders
•
End users
•
Royalty companies
•
Private funders
•
Specialised funds
•
Offtakers
•
Private funders
•
OEMs
•
Patient capital seeking asset
exposure
•
Traders
•
Net Asset Value
•
•
Replacement value
•
Market cap
Pre-finance profit margin /
AISC
•
•
Ability to operate
Pre-finance profit margin /
AISC
•
Capital intensity
Size drivers
Benefits
•
Credit metrics (EBITDA
multiples, LTV, Net Assets)
✓ Low borrowing costs
✓ Long-dated amortisation
schedule
✓ Long-term alignment around
asset
•
Capital intensity
✓ Few/no covenants during
startup period
✓ Long-duration payback
✓ Minority interest + offtake
priced closer to strategic value
High current cost of CYM equity capital favours partnership and/or non-dilutive models of funding
12
CYPRIUM | MARCH 2025 INVESTOR PRESENTATION
WHERE ARE THE OTHER BIG COPPER OPPORTUNITIES?
Selected recent transactions show that Australian developers and producers with scale and longevity have material strategic value
DEVELOPERS
MACH buys REX
BFS-stage 40ktpa surface mine
A$ 393m
PRODUCERS
Harmony buys Eva Copper
Sumitomo earns in to 30% of Winu
BFS-stage 40ktpa surface mine 222Mt M&I resource @ 0.45% Cu+Au
US$ 230m
A$ 599m
2024
2022
2024
Evolution acquires remaining
Ernest Henry Cu interests
~40ktpa copper production for
A$ 1.1bn
Metals Acquisition Corp acquires CSA
40ktpa copper production, 15 yr life for
US$ 1.1bn
2021
2022
Most of the appropriate comps to Cyprium have already been consolidated
13
CYPRIUM | MARCH 2025 INVESTOR PRESENTATION
MAROOCHYDORE REDISCOVERED
Globally significant copper resource in Paterson district within haul distance to Nifty
370.8Mt @ 0.43% Cu, 227 ppm Co
Inferred resources
1.595Mt contained Cu
06.3Mt @ 0.67% Cu, 308 ppm Co
Higher-grade zone within inferred
resource
84Kt contained Co @ 0.25% Cu cut-off
712Kt contained Cu
33Kt contained Co @ 0.45% Cu cut-off
14
CYPRIUM | MARCH 2025 INVESTOR PRESENTATION
Sedimentary copper
mineralisation style
Demonstrating significant continuity of
mineralisation and resource scale, with similar
geology to nearby Nifty Copper Complex.
Higher-grade domain
Will be further studied as satellite feed operation
to Cyprium’s nearby Nifty mill and concentrator in
the Paterson district.
SUPPLEMENTARY MATERIAL
15
CYPRIUM | MARCH 2025 INVESTOR PRESENTATION
FAST TRACK TO CASH FLOW:
RESTART COPPER
CATHODE PRODUCTION
NIFTY HEAP LEACH PADS
Copper cathode production at Nifty is the first
phase of mining operations.
A$86m
Pre-tax NPV @ 8% - Nov 24 PFS
110%
Pre-tax IRR - Nov 24 PFS
LOM Cu cathode production
24kt
Annual Cu cathode production
6ktpa
PFS assumes conservative recovery rate
Low break-even recovery rate at 40%
45%
AISC A$/t pay. Cu
A$6,800
AISC US$/lb pay. Cu
US$2.18
Development capital
A$30m
Capitalised operating costs
A$16m
SIMPLE, WELLUNDERSTOOD
PROCESSING
Reprocessing of existing
heap leach pads
NO MINING OF
OXIDE IN PIT
Excluded from PFS Cathode Project
economics; recent cathode restarts
have encountered grade
management issues with oxide and
transitional ores
NIFTY SX-EW PLANT
ADDITIONAL ORE
UPSIDE
Potential to increase
above ground ore
reserves with excluded
material
Low complexity plan designed to maximize speed to market and minimize capital requirements
16
CYPRIUM | MARCH 2025 INVESTOR PRESENTATION
1. PFS pricing: Cu price US$4.25 / pound; AUD:USD $0.71. Please refer to company announcement “Nifty PFS Confirms $1,129m Pre-Tax NPV and 797kt Ore Reserve” dated 25 November 2024 for additional information.
LARGE VALUE DRIVER:
SULPHIDE OPEN PIT AND
CONCENTRATOR RESTART
CHALCOPYRITE MINERALISATION
NIFTY EXISTING CONCENTRATOR
A$1.04B
Pre-tax NPV @ 8% - Nov 24 PFS
26.3%
Pre-tax IRR - Nov 24 PFS
20 years
Project life
694 kt
LOM production Cu
Average production Cu
38.7 ktpa
AISC A$/t pay. Cu
A$8,158
COPPER IN CONCENTRATE PRODUCTION
AISC US$/lb pay. Cu
US$2.62
kt
Development capital
A$239m
50
Capitalised operating costs
A$173m
40
Concentrate Project Ore Reserves
(753Kt contained Cu)
83Mt @ 0.90% Cu for 753 kt
45
46
46
PERMITTED SITE
Major permits required
to commence
concentrator restart are
largely complete
43
41
35
34
30
44
44
39
35
35
33
28
20
22
15
10
5
-
14
12
14
3
-
FY48
FY47
FY46
FY45
FY44
FY43
FY42
FY41
FY40
FY39
FY38
FY37
FY36
FY35
FY34
FY33
FY32
FY31
FY30
FY29
FY28
FY27
-
FY26
FAVOURABLE GEOLOGICAL
MODEL
Sediment hosted copper
deposits cost effective to mine
relative to other deposit types.
Major copper producers
pursuing sediment hosted
deposits
41
39
35
25
4.5MTPA REFURBISHED AND
EXPANDED CONCENTRATOR
Optionality to refurbish existing
3.0Mtpa concentrator for capital
light path to production with
expansion to 4.5Mtpa post restart
46
Material value lever that delivers >$1B pre-tax NPV (8%)
17
CYPRIUM | MARCH 2025 INVESTOR PRESENTATION
1. PFS pricing: Cu price US$4.25 / pound; AUD:USD $0.71. Please refer to company announcement “Nifty PFS Confirms $1,129m Pre-Tax NPV and 797kt Ore Reserve” dated 25 November 2024 for additional information.
PROJECT INTERACTIONS CAN BE WELL MANAGED
Interaction of the Cathode Project and Concentrate Project assuming simultaneous project operations
Fast access to sulphide ores from oxide open pit
– Oxide ores were mined from a shallow open pit, put on heap leach pads and leached –
with resulting pregnant solution being sent to the SXEW for refinement and processing
into copper cathodes
– The open pit ended with access to sulphide copper minerals
– November PFS shows rapid access from historic open pit to material that can be
processed via the concentrator into concentrate for smelter market, in the order of 9 - 12
months
New surface mining activity will eventually interact with the heap leach pads
– As the PFS open pit advances, it is projected that surface mining operations will interact
with Pads 1 - 4 around year 8 of mining
– Two-thirds of the material on the heap leach is on Pads 5 - 6
– The PFS base plan is to releach Pads 5 - 6 in place and gradually strip the re-leached
material to an appropriately built permanent storage pad
– At some point after commencement of the Concentrate Project, materials from Pads 1 - 4
would be moved to the currently permitted Pad 7 (not shown in diagram adjacent) and
retreated
– New oxide ores within the PFS pit shell would also contribute to the Cathode Project.
(This open-pit oxide material was not included in the Nov 2024 PFS economics)
Nov 2024 PFS demonstrates that Cathode Project site interactions
with Concentrate Project can be managed, allowing for
simultaneous or sequential startup
18
CYPRIUM | MARCH 2025 INVESTOR PRESENTATION
1. Please refer to company announcement “Nifty PFS Confirms $1,129m Pre-Tax NPV and 797kt Ore Reserve” dated 25 November 2024 for additional information.
DISCLAIMERS AND FORWARD-LOOKING STATEMENTS
IMPORTANT: You must read the following before continuing. This Investor Presentation (“Presentation”) has been prepared by Cyprium Metals Limited (ABN 48 002 678 640) (“Cyprium” or “Company”) and authorised for release by the Executive Chair of Cyprium.
Summary information
By reviewing or retaining these materials, or attending or participating in this Presentation, you acknowledge and represent that you have read, understood and accepted the terms of this disclaimer. This Presentation contains summary information about Cyprium, and its activities
current only at the date of this Presentation. This Presentation is for information purposes only. The information in the Presentation is of a general nature only and does not purport to be complete. This Presentation should be read in conjunction with Cyprium’s most recent financial
report and other periodic and continuous disclosure announcements lodged with the Australian Securities Exchange (“ASX”) which are available at www.asx.com.au and also available on Cyprium’s website at www.cypriummetals.com.
Certain information in this Presentation has been sourced from Metals X Limited, the former owner of the Paterson Copper Portfolio and their representatives or associates. While steps have been taken to review that information, no representation or warranty, expressed or
implied, is made as to its fairness, correctness, completeness or accuracy. Certain information in this Presentation may have been obtained from research, surveys or studies conducted by third parties, including industry or general publications. Neither Cyprium nor its
representatives have independently verified any such information sourced from third parties or industry or general publications.
Not an offer
This Presentation is for information purposes and is not, and does not purport to be, a prospectus, product disclosure statement or any other offering document under Australian law or the law of any other jurisdiction (and will not be lodged with the Australian Securities and
Investments Commission (“ASIC”) or any foreign regulator). The information does not and will not constitute or form part of an offer, invitation, solicitation or recommendation in relation to the subscription, purchase or sale of securities in any jurisdiction and neither this
Presentation nor anything in it shall form any part of any contract for the acquisition of Cyprium shares. The distribution of this Presentation in jurisdictions outside Australia may be restricted by law and you should observe any such restrictions.
Not investment or financial product advice
This Presentation does not constitute financial product, investment, legal, taxation, accounting or other advice and is not intended to be used or relied upon as the basis for making an investment decision. This Presentation is not a recommendation by Cyprium or its advisers to
acquire Cyprium shares or New Shares. This Presentation has been prepared without taking into account the objectives, financial situation or needs of individuals. Before making an investment decision, prospective investors should consider the appropriateness of the information
having regard to their own objectives, financial situation and needs and seek financial, legal and taxation advice appropriate to their jurisdiction. Cyprium is not licensed to provide financial product advice in respect of Cyprium shares.
Effect of rounding
A number of figures, amounts, percentages, estimates, calculations of value and fractions in this Presentation are subject to the effect of rounding. Accordingly, the actual calculation of these figures may differ from the figures set out in this Presentation.
Past performance
Past performance information, including past share price performance of Cyprium and pro forma financial information, given in this Presentation is given for illustrative purposes only and should not be relied upon as (and is not) an indication of Cyprium’s (or anyone else’s) views
on Cyprium’s future financial performance or condition. Past performance of Cyprium cannot be relied upon as an indicator of (and provides no guidance as to) the future performance of Cyprium. Nothing contained in this Presentation nor any information made available to you is,
or shall be relied upon as a promise, representation, warranty or guarantee, whether as to the past, present or future.
Forward-looking statements
This Presentation contains certain “forward-looking statements” and comments about future events, including statements regarding Cyprium’s intent, belief or current expectations with respect to the Company’s business and operations, market conditions, results of operations and
financial condition, and risk management practices. The words “likely”, “expect”, “aim”, “should”, “could”, “may”, “anticipate”, “predict”, “believe”, “plan”, “estimate”, “will”, “believe”, “target” and other similar expressions are intended to identify forward-looking statements.
Indications of, and guidance outlook on, future earnings or financial position or performance are also forward-looking statements and include statements in this Presentation regarding the conduct and the future performance of Cyprium.
Forward-looking statements are provided as a general guide only and should not be relied upon as an indication or guarantee of future performance. Actual results, performance or achievements may differ materially from those expressed or implied in such statements and any
projections and assumption on which these statements are based. These statements may assume the success of Cyprium’s business strategies. The success of any of those strategies will be realised in the period for which the forward-looking statement may have been prepared
or otherwise. Recipients of this Presentation are cautioned not to place undue reliance on forward-looking statements, and except as required by law or regulation, none of Cyprium, its representatives or advisers assumes any obligation to update these forward-looking statements.
No representation or warranty, express or implied, is made as to the accuracy, likelihood of achievement or reasonableness of any forecasts, prospects, returns or statements in relation to future matters contained in this Presentation. The forward-looking statements are based on
information available to Cyprium as at the date of this Presentation. Except as required by law or regulation (including the ASX Listing Rules), none of Cyprium, its representatives or advisers undertakes any obligation to provide any additional or updated information whether as a
result of a change in expectations or assumptions, new information, future events or results or otherwise. Indications of, and guidance or outlook on, future earnings or financial position or performance are also forward-looking statements.
Cautionary Statements and Competent Person Statement
This document contains information from the Nifty Copper Complex - Pre-feasibility Study (PFS) which was released on 27 November 2024. Please refer to the cautionary statements in that document in detail. The information in the Pre-feasibility Study is supported by a
Competent Person Statement, please refer to the ASX release dated 27 November 2024 for further details.
References to Mineral Resources, Ore Reserves and PFS
The information in this announcement that relates to Mineral Resources for Nifty and Maroochydore was previously reported by the Company in announcements made in March, August and November 2024 (Nifty) and February 2025 (Maroochydore). The Company confirms that it
is not aware of any new information or data that materially affects the information included in those market announcements and, in the case of Mineral Resources and PFS, all material assumptions and technical parameters underpinning the estimates continue to apply and have
not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.
19
CYPRIUM | MARCH 2025 INVESTOR PRESENTATION
CONTACT
Matt Fifield
Executive Chairman
Dannika Warburton
Investor and Media Relations
E: communications@cypriummetals.com
Registered Office
Level 1, 437 Roberts Road
Subiaco WA 6008
Australia
Telephone
+61 8 6374 1550
www.cypriummetals.com
Share your feedback
Discover