Investor Presentation
Released
Released
Announcement PDF
INVESTOR PRESENTATION:
1Q RESULTS AND UPDATE
9 MAY 2024
www.cypriummetals.com
DISCLAIMERS AND FORWARD-LOOKING STATEMENTS
IMPORTANT: You must read the following before continuing.
This Shareholder Update Presentation (“Presentation”) has been prepared by Cyprium Metals Limited (ABN 48 002 678 640) (“Cyprium” or “Company”) and authorised for release to ASX by the Board of Directors.
Summary information
By reviewing or retaining these materials, or attending or participating in this Presentation, you acknowledge and represent that you have read, understood and accepted the terms of this “Important Notices and Disclaimer”. This Presentation contains summary information
about Cyprium, and its activities current only at the date of this Presentation. This Presentation is for information purposes only. The information in the Presentation is of a general nature only and does not purport to be complete. This Presentation should be read in conjunction
with Cyprium’s most recent financial report and other periodic and continuous disclosure announcements lodged with the Australian Securities Exchange (“ASX”) which are available at www.asx.com.au and also available on Cyprium’s website at www.cypriummetals.com.
Certain information in this Presentation has been sourced from Metals X Limited, the former owner of Paterson and their representatives or associates. While steps have been taken to review that information, no representation or warranty, expressed or implied, is made as to its
fairness, correctness, completeness or accuracy. Certain information in this Presentation may have been obtained from research, surveys or studies conducted by third parties, including industry or general publications. Neither Cyprium nor its representatives have
independently verified any such information sourced from third parties or industry or general publications.
Not an offer
This Presentation is for information purposes and is not, and does not purport to be, a prospectus, product disclosure statement or any other offering document under Australian law or the law of any other jurisdiction (and will not be lodged with the Australian Securities and
Investments Commission (“ASIC”) or any foreign regulator). The information does not and will not constitute or form part of an offer, invitation, solicitation or recommendation in relation to the subscription, purchase or sale of securities in any jurisdiction and neither this
Presentation nor anything in it shall form any part of any contract for the acquisition of Cyprium shares. The distribution of this Presentation in jurisdictions outside Australia may be restricted by law and you should observe any such restrictions.
Not investment or financial product advice
This Presentation does not constitute financial product, investment, legal, taxation, accounting or other advice and is not intended to be used or relied upon as the basis for making an investment decision. This Presentation is not a recommendation by Cyprium or its advisers to
acquire Cyprium shares or New Shares. This Presentation has been prepared without taking into account the objectives, financial situation or needs of individuals. Before making an investment decision, prospective investors should consider the appropriateness of the
information having regard to their own objectives, financial situation and needs and seek financial, legal and taxation advice appropriate to their jurisdiction. Cyprium is not licensed to provide financial product advice in respect of Cyprium shares.
Effect of rounding
A number of figures, amounts, percentages, estimates, calculations of value and fractions in this Presentation are subject to the effect of rounding. Accordingly, the actual calculation of these figures may differ from the figures set out in this Presentation.
Past performance
Past performance information, including past share price performance of Cyprium and pro forma financial information, given in this Presentation is given for illustrative purposes only and should not be relied upon as (and is not) an indication of Cyprium’s (or anyone else’s) views
on Cyprium’s future financial performance or condition. Past performance of Cyprium cannot be relied upon as an indicator of (and provides no guidance as to) the future performance of Cyprium. Nothing contained in this Presentation nor any information made available to you
is, or shall be relied upon as a promise, representation, warranty or guarantee, whether as to the past, present or future.
Forward-looking statements
This Presentation contains certain “forward-looking statements” and comments about future events, including statements regarding Cyprium’s intent, belief or current expectations with respect to the Company’s business and operations, market conditions, results of operations
and financial condition, and risk management practices. The words “likely”, “expect”, “aim”, “should”, “could”, “may”, “anticipate”, “predict”, “believe”, “plan”, “estimate”, “will”, “believe”, “target” and other similar expressions are intended to identify forward-looking
statements. Indications of, and guidance outlook on, future earnings or financial position or performance are also forward-looking statements and include statements in this Presentation regarding the conduct and the future performance of Cyprium.
Forward-looking statements are provided as a general guide only and should not be relied upon as an indication or guarantee of future performance. Actual results, performance or achievements may differ materially from those expressed or implied in such statements and any
projections and assumption on which these statements are based. These statements may assume the success of Cyprium’s business strategies. The success of any of those strategies will be realised in the period for which the forward-looking statement may have been
prepared or otherwise. Recipients of this Presentation are cautioned not to place undue reliance on forward-looking statements, and except as required by law or regulation, none of Cyprium, its representatives or advisers assumes any obligation to update these forward-looking
statements. No representation or warranty, express or implied, is made as to the accuracy, likelihood of achievement or reasonableness of any forecasts, prospects, returns or statements in relation to future matters contained in this Presentation. The forward-looking statements
are based on information available to Cyprium as at the date of this Presentation. Except as required by law or regulation (including the ASX Listing Rules), none of Cyprium, its representatives or advisers undertakes any obligation to provide any additional or updated
information whether as a result of a change in expectations or assumptions, new information, future events or results or otherwise. Indications of, and guidance or outlook on, future earnings or financial position or performance are also forward-looking statements.
CAUTIONARY STATEMENT
The Production Targets are based on information that is considered to be at scoping study level however there is no certainty that the Production Target will be realized.
2
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
CYPRIUM METALS (ASX:CYM) – AT A GLANCE
Share Trading History – Last 12 Months
0.120
0.100
3,000
Trading suspended
2,500
0.080
2,000
0.060
1,500
0.040
1,000
0.020
500
Matt Fifield
Exec Chairman
Ross Bhappu
Non-Exec Director
Gary Comb
Non-Exec Director
Scott Perry
Non-Exec Director
David Hwang
Corporate Secretary
Corporate Team
ASX: CYM
6 May 2024
Share Price
$0.039
Shares on issue
1,525m
Market Value
$59.5m
Cash
$13.5m
Secured debt
$15.5m
Top Owners (As of 31 March 2024)
Convertible notes1
$36.0m
Flatfooted
10.0%
Gavin Hammer
GM – Nifty
Enterprise Value
$97.5m
Paradice
7.8%
Bernard Etschmann
Process Engineer
Pacific Road Capital1
7.2%
Peter Van Luyt
Chief Geologist
CI Global Asset Mgmt
6.2%
Mark Styles
Exploration Geologist
All institutional
50.7%
Chris Marissen
Mining Engineer
All directors/insiders1
19.7%
Options, warrants, rights2
572m
Market Value, fully diluted
$81.8m
Enterprise Value, fully diluted3
$90.5m
Available capital resources4
$18.8m
Balance sheet information as of 31 March 2024.
1. Convertible Notes due 31 March 2025 are convertible at holder’s option and
with an effective conversion price of $0.335 per share are counted as debt in
calculation of enterprise value.
2. Options with $0.06 strike price expire 31 Dec 2024; Sr Debt Warrants with
$0.048 strike price expire 13 Sep 2025; 68 million performance rights have
variable target-based vesting thresholds.
3. Includes cash effect of $29m from exercise of all options, warrants and rights.
4. Cash on hand plus available capital from debt facilities. Excludes any cash from
exercise of options or warrants.
3
Governance Team
Shares traded, mm
Cyprium Metals Ltd is an ASX-listed Australian copper
company. Its flagship property is the Nifty Copper Mine in
Western Australia, which previously produced over
750,000 tonnes of copper. Cyprium is focused on
restarting Nifty to take advantage of significant invested
capital, large-scale resources, and current operational
approvals. Other assets include significant copperfocused properties in the Paterson and Murchison
Provinces.
AUD per share
Company Description
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
May-23
1.
Jul-23
Sep-23
Nov-23
Jan-24
Dollar volume
Price
Mar-24
0
May-24
On Issue
Pacific Road Capital is an affiliate of Matt Fifield who is also an insider.
Trading Liquidity
1-Mar
6-May
30-day ADTV
$30k
$431k
90-day ADTV
$41k
$184
Matt Fifield
Exec Chairman
Milan Jerkovic
COO
Manu Trivedi
CFO
John Gardner
IR and Media Advisor
Technical Team
FIRST QUARTER RESULTS
Quickly moving through the work
Quarterly Highlights
• Important work streams at Nifty advanced
• Updated MRE released with +1 million tonnes in Nifty open pit resources
• Heeler discovery in Murchison – shallow and high grade
• Key Appointments: Matt Fifield to Exec Chair, Scott Perry to Board
Key Timelines
Item
Mar
Apr
May
Jun
Jul
SX-EW Restart
Concept Plan
X
Execution Plan, Financing
FID
Large Surface Mine
Financial Results
MRE Update
• Cash expenditure of $9.1m
– $2.6m admin and corporate
– $1.9m interest on convertible note and debt
– $0.8m in exploration
– $2.5m of feasibility studies and sustaining capex
– $1.4m of staff costs ($0.9m non-recurring)
Reserve Statement
Update on asset sales
• Ended quarter with $13.5m cash on hand and $18.8m in total available capital
resources
Quarterly / Half Yearly
X
Annual Report, AGS, NOM
X
• Investigation into quick wins on asset sales doesn’t appear to be accretive
– Work continues
4
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
X
Concept Plan
Depends on PFS
PFS
X
On-cycle Communications
End of year financials
AGM
X
X
May 28
NEAR-TERM COPPER PRODUCTION AT NIFTY: CATHODE
Cathode in 2025, Concentrate in 2027
5
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
RE-TREAT EXISTING HEAPS IN PLACE AND DE-STACK
Cathode in 2025, Concentrate in 2027
Simple operating plan on retreatment
Residual Copper
17.2mt @ 0.53%
Cu for 91kt
contained metal
–
–
Existing heaps were built up in 3m layers
Heaps are turned over by small excavator in
3m lifts to refresh surface areas, then
re-leached
–
Copper-rich solution is recovered through
existing gravity drainage system and sent
to ponds, then plant
–
Depleted material is stripped and removed
–
The process is repeated for layers below
Target Production of 5-6,000 tpa
–
–
–
There is a significant body of work from prior
studies that underpins the mineral inventory and
recovery profiles
Existing infrastructure is capable of producing in
the range of 10ktpa
We are targeting a conservative production
profile to establish production
Low complexity plan designed to maximize speed to market and minimize capital requirements
6
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
RECOVER COPPER IN EXISTING PLANT WHEN REFURBISHED
Cathode in 2025, Concentrate in 2027
Existing Power Supply
Project execution is straightforward:
re-wire, re-motor, and repair
existing equipment on site
necessary to support a
the project life
Existing Solvent Extraction Plant
Existing Solution Ponds
Existing R.O. Plant
Existing Electrowinning Plant
Many benefits of brownfield site. Execution planning under way to firm cost estimate and timelines.
7
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
CATHODE PLAN WILL MAKE CYM STRONGER
Cathode in 2025, Concentrate in 2027
Tailwinds from strong projected copper prices
Consensus Copper Prices from April 241
2024
2025
2026
2027
2028
Source: S&P Market Intelligence.
1. Consensus price for 12 major financial institutions that have updated commodity prices from April
2024.
In current copper market, SXEW restart should provide opportunity to generate meaningful cash flow
8
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
MOVING THROUGH WORK STREAMS TOWARDS FID
SX-EW Restart Development Process
Resource and Met
Confirmation
Conceptual
Plan
We are here
Execution
Planning
Offtake and
Financing
Board Approval
& FID
9
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
NEAR-TERM COPPER PRODUCTION AT NIFTY: CONCENTRATE
Cathode in 2025, Concentrate in 2027
Our expectations:
Concept study release expected in this quarter
PFS in following quarter
10
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
BUILDING BEST-IN-CLASS TEAM AND PERFORMANCE CULTURE
Rare chance to build a meaningful copper company quickly
Strengthening team and ability to move from past to future
11
Matt
Fifield
Ross
Bhappu
Scott
Perry
Gary
Comb
Milan
Jerkovic
Manu
Trivedi
Exec Chair
NED
NED
NED
COO
CFO – Interim
Pacific Road
Managing Partner
RCF
Partner
Mature PE Funds
Centerra Gold
President & CEO
Leightons Contracting
Former MD
Straits Res.
CEO
Expanded copper leach
operations at Nifty
Experienced financial
executive in mining
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
COPPER-FOCUSED RESOURCES IN PATERSON AND MURCHISON
Beyond Nifty, our copper-focused exploration portfolio will be a growth engine in the years to come.
• Paterson Province: Prospective ground for large sediment-hosted deposits
– Maroochydore: significant copper-cobalt resource proximate to Nifty
– IGO farm-in to 70% for $32 million on large tenement package
– “Near Nifty” = greenfield exploration within CYM’s state agreement
• Murchison Province: exploring for base metals in areas historically explored only for gold
– Nanadie Well: large tonnage orthomagmatic-hosted polymetallic resource
– Cue/Hollandaire: high-grade copper-gold-silver polymetallic resource and features recent Heeler hit
CYPRIUM METALS GLOBAL RESOURCES, COPPER-EQUIVALENT BASIS1
Property
Nifty
Measured and Indicated
Cu-Eq
Cont. Metal
Tonnes
Grade
kt Cu-Eq
Area
Tonnes
Inferred
Cu-Eq
Grade
Cont. Metal
kt Cu-Eq
Measured, Indicated & Inferred
Cu-Eq
Cont. Metal
Tonnes
Grade
kt Cu-Eq
Heap Leach
Open-Pit
118,970,000
0.85%
1,009,845
6,048,000
0.47%
28,381
125,018,000
0.83%
1,038,226
Maroochydore
Hollandaire
Nanadie Well
All
All
All
40,800,000
2,179,000
-
1.03%
2.29%
0.00%
420,537
49,848
-
7,830,000
605,000
40,400,000
1.50%
1.96%
0.56%
117,300
11,881
226,077
48,630,000
2,784,000
40,400,000
1.11%
2.22%
0.56%
537,837
61,729
226,077
Total
All
161,949,000
0.91%
1,480,230
54,883,000
0.70%
383,639
216,832,000
0.86%
1,863,868
1. Please see Important Notices which includes “Calculation of Copper Equivalent” and “Competent Person’s Statement”.
1.9 million tonnes of copper-equivalent resources in Western Australia
12
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
Residual Copper in Heaps
Cu-Eq
Cont. Metal
Tonnes
Grade
kt Cu-Eq
17,200,000
17,200,000
0.53%
-
90,935
-
-
-
0.53%
90,935
CYM DEVELOPMENT STRATEGY
Cathode in 2025, Concentrate in 2027 and organic growth beyond
HIGH
Project
execution
Nifty
SX-EW
Restart
Design /
feasibility
Project
Knowledge
Baseline
Nifty Copper
Large Surface Mine
Conceptual
plans
Maroochydore
MEDIUM
Murchison
Assets
Resource
delineation
Near
Nifty
Greenfield
exploration
Expl JV
w/ IGO
LOW
NOW
13
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
1Y
3Y
Catalyst required
Longer term
IMPORTANT NOTICES
Competent Person’s Statement
The information in this report that relates to estimation and reporting of Mineral Resource Estimates is an accurate representation of the available data and is based on information compiled by
external consultants and Mr. Peter van Luyt who is a member of the Australian Institute of Geoscientists (2582). Mr. van Luyt is the General Manager – Geology and Exploration for Cyprium
Metals Limited, in which he is also a shareholder. Mr. van Luyt has sufficient experience which is relevant to the styles of mineralisation and types of deposit under consideration and to the
activity which he is undertaking to qualify as a Competent Person (CP). Mr. van Luyt consents to the inclusion in the report of the matters based on his information in the form and context in
which it appears.
Calculation of Copper Equivalent
Copper equivalent grades have been calculated using an AUD/USD exchange rate of 0.63 and based on the following assumed metal prices: copper – AUD $15,049.89/t; gold – AUD
$3,568.55/oz; silver – AUD $40.38/oz; platinum – AUD $1,467.57/oz; palladium – AUD $1,465/oz; cobalt – AUD $40,361.54/t; nickel – AUD $28,763.51/t; zinc AUD $4,333.77/t.
The following formulae have been used to calculate copper equivalent grades, with results rounded to two decimal places:
• Nifty – MRE for the open pit and Mineral Inventory for the heap leach quote Cu only.
• Maroochydore – Cu-Eq grade (%) = Cu % + (Co % x 2.68) + (Zn % x 0.29).
• Hollandaire – Cu-Eq grade (%) = Cu % + (Au g/t x 0.76) + (Ag g/t x 0.01).
• Nanadie Well – Cu-Eq grade (%) = Cu % + (Au g/t x 0.76) + (Ag g/t x 0.01) + (Co % x 2.68) + (Ni % x 1.91) + (Zn % x 0.29).
Potential metallurgical recoveries can be estimated based on recoveries for similar deposit styles:
• Sediment-hosted deposits (Nifty, Maroochydore) – 85% Cu, 50% Co, 50% Zn.
• VMS deposits (Hollandaire) – 85% Cu, 70% Au, 50% Ag.
• Mafic-associated orthomagmatic sulphide deposits (Nanadie Well) – 90% Cu, 70% Pt, 70% Pd, 60% Au, 55% Ni, 55% Co, 50% Zn.
14
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
IMPORTANT NOTICES
Mineral Resource Estimates on which Cu equivalent calculations are based
MAROOCHYDORE MINERAL RESOURCE ESTIMATE 2013
Material type
Oxide
Sulphide
All material
Resource
Category
Indicated
Inferred
Volume m3
BD
Tonnes
Cu eq %
Cu eq T
Cu %
Cu T
Co ppm
Co T
Zn ppm
Zn T
18,561,818
1,073,636
2.2
2.2
40,836,000
2,362,000
1.03
0.94
420,265
22,146
0.92
0.81
375,691
19,132
388
451
15,844
1,065
174
227
7,105
536
Sub Total
19,635,455
2.2
43,198,000
1.02
442,411
0.91
394,823
391
16,910
177
7,642
Inferred
1,941,071
2.8
5,435,000
1.74
94,775
1.66
90,221
292
1,587
187
1,016
Sub Total
1,941,071
2.8
5,435,000
1.74
94,775
1.66
90,221
292
1,587
187
1,016
TOTAL
21,576,526
2.27
48,633,000
1.10
537,186
1.00
485,044
380
18,497
178
8,658
HOLLANDAIRE MINERAL RESOURCE ESTIMATE 2020
Material type
Resource
Category
Indicated
Volume m3
Tonnes
Cu eq %
Cu eq T
Cu %
Cu T
Au g/t
Au Oz
Ag g/t
Ag Oz
5,297
9,534
1.30
124
1.20
114
0.09
28
4.00
1,226
Transitional
Sub Total
Indicated
Inferred
5,297
94,984
4,266
9,534
274,768
12,081
1.30
2.03
0.42
124
5,567
51
1.20
1.80
0.40
114
4,946
48
0.09
0.24
0.02
28
2,120
8
4.00
5.00
1.00
1,226
44,170
388
Fresh
Sub Total
Indicated
Inferred
99,250
637,906
193,609
286,849
1,894,325
593,172
1.96
2.25
1.94
5,618
42,691
11,497
1.74
1.96
1.57
4,994
37,129
9,313
0.23
0.31
0.41
2,128
18,880
7,819
4.83
6.64
6.46
44,558
404,402
123,198
Sub Total
831,515
2,487,497
2.18
54,188
1.87
46,442
0.33
26,699
6.60
527,600
TOTAL
936,062
2,783,880
2.15
59,931
1.85
51,550
0.32
28,855
6.41
573,385
Oxide
All material
NANADIE WELL MINERAL RESOURCE ESTIMATE 2021
Resource
Category
Inferred
top cut
Total
15
Tonnes
Cu eq %
Cu eq T
Cu %
Cu T
Au g/t
Au Oz
Ag g/t
Ag kOz
Co ppm
Co T
Ni ppm
Ni T
Zn ppm
Zn T
1,300,000
200,000
Bulk
Density
2.8
2.9
3,500,000
600,000
0.63
0.63
21,976
3,803
0.44
0.45
15,400
2,700
0.12
0.12
13,503
2,315
0.70
1.50
79
29
70
60
245
36
350
310
1,225
186
160
140
560
84
Fresh
11,700,000
3.1
36,300,000
0.55
199,376
0.39
141,570
0.10
116,707
1.10
1,284
50
1,815
290
10,527
160
5,808
All material
13,200,000
3.1
40,400,000
0.56
225,587
0.40
161,600
0.10
129,889
1.00
1,299
50
2,020
290
11,716
160
6,464
Material type
Volume m3
Oxide
Transitional
CYPRIUM | INVESTOR PRESENTATION | MAY 2024
THANK YOU
Contact Us
Registered Office &
Principal Place of Business
Unit 1, 437 Roberts Road
Subiaco WA 6008
Australia
Telephone
+61 8 6374 1550
www.cypriummetals.com
Share your feedback
Discover