Interim Financial Report
Released
Released
Announcement PDF
Interim
Financial
Report
DEC
20
25
ASX: CYM | OTCQB: CYPMF
Contents
Corporate Directory 3
Director’s Report 4
Review of Operations 5
Corporate Update 7
Directors 8
Auditor’s Independence Declaration 9
Condensed Consolidated Statement of
Profit or Loss and Other Comprehensive Income 10
Condensed Consolidated
Statement of Financial Position 11
Condensed Consolidated
Statement of Changes in Equity 12
Condensed Consolidated Statement of Cash Flows 13
Notes to the Condensed Consolidated
Interim Financial Statements 14
Directors’ Declaration 26
Independent Auditor’s Report 27
2
Cyprium Metals I INTERIM FINANCIAL REPORT
Corporate
Directory
Directors
J. Matthew Fifield (Executive Chairman)
Gary Comb (Non-Executive Director)
Scott Perry (Non-Executive Director)
Amber Banfield (Non-Executive Director)
James Simpson (Non-Executive Director)
Auditors
HLB Mann Judd
Level 4, 130 Stirling Street
Perth WA 6000
Company Secretary
David Hwang
Website
www.cypriummetals.com
Registered Office &
Principal Place of Business
Level 1
437 Roberts Road
Subiaco WA 6008
Telephone: +61 8 6374 1550
Share Registry
Automic
Level 5, 191 St Georges Terrace
Perth NSW 6000
Telephone: 1300 288 664 or
+61 2 8072 1400
Securities Exchange
Australian Securities Exchange
ABN: 48 002 678 640
ASX Code: CYM
3
3
ASX: CYM | OTCQB: CYPMF Cyprium Metals I INTERIM FINANCIAL REPORT
Directors’ Report
Thank you for your
continued support.
Chairman’s Letter to Shareholders
Dear fellow shareholders,
The past six months have been a period of significant
progress and renewed momentum for the Company.
Building on the foundations established through FY2025,
we have continued to advance the commercial, technical
and operational work required to bring the Nifty Copper
Complex back into production. Nifty is one of the most
compelling brownfield copper opportunities globally,
and its strategic value has only strengthened as markets
increasingly seek secure, long term copper supply to
support the global energy transition.
To accelerate the Nifty restart program, the Company
successfully completed an $80 million equity raising and
Share Purchase Plan in October 2025, receiving strong
support from both existing and new institutional investors.
We have since launched a second placement and entitlement
offer in January 2026 to raise new proceeds of $41 million. This
funding, coupled with the refinancing of our senior secured
loan facility with Nebari in November 2025, has materially
strengthened our balance sheet and ensured we are well
positioned to deliver the cathode restart and advance
further Nifty growth phases.
During the reporting period, we enhanced our governance
and leadership capability with the appointment of Jim
Simpson and Amber Banfield as non executive directors.
Their extensive operational and strategic experience adds
further depth to the Board as we rapidly advance toward
first production at Nifty. With their appointment, Ross
Bhappu concluded his tenure as a non-executive director
following our AGM in November 2025. On behalf of the
Board, I thank Ross for his dedication and contributions to
the business over the past two years.
On site at Nifty, we have made strong operational progress
in the restoration and refurbishment of key heap leach
infrastructure, with completed works at the W drains, ILS
and PLS ponds, and new acid storage facilities. Long lead
items have been ordered, enabling the team to commence
refurbishment activities on the SX-EW plant. With this
momentum, we remain on track to deliver first copper
cathode in mid 2026.
Our partnerships with Glencore and Macmahon have
further reinforced the quality and credibility of our ongoing
redevelopment pathway at Nifty. Macmahon, in particular,
has brought valuable operational insight to the refinement
of cost, scheduling and execution parameters, ensuring
that our restart strategy is both technically robust and
validated by industry leading expertise.
Beyond the restart, we continue to strengthen our broader
resource growth pipeline. Cyprium previously reacquired
control of the Paterson Exploration Project, encompassing
1,938 km² of tenure in this world class copper province. Our
Paterson tenure is accompanied by an extensive technical
database of drilling, geophysical, and geochemical data
from legacy exploration programs, including $24 million
of exploration expenditure undertaken by IGO. A first-
pass review of this data was completed post-end of the
reporting period, confirming the presence of multiple high
priority targets that could provide potential future ore feed
for a hub and spoke development model anchored by the
existing Nifty processing infrastructure.
With strong momentum behind our phased Nifty
redevelopment strategy, robust institutional investment
support, experienced strategic and execution partners,
and a copper market underpinned by a long term structural
supply deficit, Cyprium is exceptionally well positioned to
transition into a premium Australian copper producer
over the next six months. We look forward to delivering
continued progress and value creation under the disciplined
execution of the Nifty restart after 2026 as we continue to
build Australia’s next great copper company.
Yours faithfully,
J. Matthew Fifield | Executive Chairman
Perth, WA
12 March 2026
The Directors present their report for Cyprium Metals Limited (“CYM”, “Cyprium” or “the Company”) and its subsidiaries (“the
Group”) for the 6 months ended 31 December 2025. All amounts are expressed in Australian Dollars unless otherwise stated.
4
ASX: CYM | OTCQB: CYPMF Cyprium Metals I INTERIM FINANCIAL REPORT
Review of Operations
During the period, Cyprium advanced its phased restart
of existing heap leach infrastructure at the Nifty Copper
Complex. This work centred on progressing environmental
compliance activities on site, including the refurbishment
and upgrade of the W drains and the leach solution
pond system next to the heap leach pads, as well as
moving forward with refurbishment of the SX-EW plant
to support cathode production. The restart of cathode
operations is strategically important to Cyprium as it
marks Cyprium’s transition from developer to producer
and brings an important source of Australian Copper back
online. The initial cathode operations are expected to
generate substantial cash flow to support the company
and represent only the first phase in reactivating the Nifty
Copper Complex.
Cathode Restart approved
by the Cyprium Board
On 20 November 2025, the Cyprium Board of Directors
approved the Cathode Project restart plan, authorising
significant expenditure to keep the project on schedule for
first copper cathode production in mid-2026.
The restart program consists of four key work phases:
• Re establishing the heap leach support infrastructure,
including restoring drainage systems and ponds that
had filled with debris over time. New liners have also
been installed to ensure long term compliance. Work
completed in the second half of 2025 has brought this
phase to the level required to recommence leaching
activities.
• Commissioning of leaching activities, involving
construction of a new acid terminal along with pumps,
valves, pipelines, irrigation equipment, and the turnover
of heap material by excavator to improve solution
contact.
• Refurbishing the SXEW plant, including electrical,
mechanical and structural upgrades to both the solvent
extraction and electrowinning circuits, as well as control
and instrumentation systems.
• Strengthening site wide support infrastructure to
ensure operational readiness. This includes establishing
standard operating procedures, safety systems,
environmental monitoring, training programs and
preparing site services for the workforce.
As part of the Board’s approval, all critical early works
and procurement of long lead items related to these four
phases were approved.
Cathode Restart Project Status
During the period, Cyprium and Macmahon continued
to progress operational readiness activities for the
cathode restart project. Detailed project execution
planning was completed, alongside finalisation of the
master delivery schedule and identification of the critical
path. To maintain schedule certainty, long lead items
were ordered and early works were completed, including
construction of foundations for the new acid storage and
distribution system. Significant progress was also made in
re-establishing the heap leach support infrastructure.
In parallel, the mine safety management system was further
strengthened through the application of MAH systems,
collaborative risk assessments and third party assurance
processes. Owner team project controls and governance
systems were established, drainage infrastructure
around the tailings storage facility was upgraded, and key
personnel and consultants were identified and engaged.
Installation of pit dewatering systems also commenced,
supporting ongoing site readiness for restart activities.
Notice to Proceed approved
by the WA Government
On 17 November 2025, the Western Australia Department of
Energy and Economic Diversification approved Cyprium’s
Notice to Proceed, marking the final administrative step
required under the State Agreement before cathode
operations can restart. This approval followed extensive
regulatory submissions and aligns with the broader restart
strategy for the Nifty Copper Complex.
5
ASX: CYM | OTCQB: CYPMF Cyprium Metals I INTERIM FINANCIAL REPORT
Exploration And
Development Update
During the period, Cyprium continued to advance
exploration and development activities across its portfolio,
with a focus on unlocking near term growth opportunities
and supporting the planned restart of operations at the
Nifty Copper Complex.
Nifty Copper Complex – Phase 2 Open-Pit Mining
Workstreams continued across the quarter around the
development of a phased open-pit mine plan and pre-
strip sequencing that best leverages infrastructure
and approvals on site to improve capital intensity of an
open-pit project.
Near-Nifty Exploration
The Nifty Copper Complex is underpinned by a sediment-
hosted copper orebody that is tabular in nature. There
is significant mineralisation up dip and along strike from
the old underground mine that operated until 2019
(abandoned 2021) that is the focus of the Phase 2 Open-
Pit Mining studies. There is also evidence of significant
mineralisation that extends along strike and downdip
from the old underground mine that has been drilled by
prior owners, and anomalous copper exploration results
in the area of the Nifty Copper Complex that suggest the
potential for faulted offset extensions of the orebody.
During the period the Company designed and progressed
two small drill programs to test conceptual targets at the
Nifty Copper Complex: (1) Diamond drilling to test an offset
segment of the Nifty host sequence to the southeast of the
old underground mine; (2) RC drilling to locate extensions
to anomalous copper mineralisation intersected in historic
drillholes northwest of the pit.
Maroochydore Copper-Cobalt Project
The Company continues to examine the potential for the
Maroochydore Copper-Cobalt deposit to provide ore feed
into a Paterson hub and spoke processing model using the
existing SXEW plant and sulphide concentrator at the Nifty
Copper Complex. Planning for 2026 field season exploration
activities was progressed.
6
Cyprium Metals I Annual Report 2025
Paterson Exploration
Following the dissolution of the Joint Venture and Farm-in
Agreement with IGO, Cyprium now has direct control of
the tenements that comprise the Paterson Exploration
Project and has received significant exploration data from
IGO following its $24 million expenditure during its control
period. Cyprium continues to review the exploration data
from the Paterson Exploration Project. Activities during the
period included:
• A heritage survey completed at the Rainbow Prospect
to facilitate drill testing of the historically defined
mineralised areas
• Prior exploration results at Rainbow were reviewed, and
sample pulps from 2018 exploration at Rainbow were
collected and submitted to lab for re-assaying
• Field visits to the NL05a target completed and drill sites
pegged
Cue Copper-Gold Project
At the Cue Copper Gold Project, drilling is planned to
commence at the Heeler and Eelya South prospects in 2H
FY26 while the Company continues to evaluate longer term
strategic options for the asset.
Environment
Cyprium Metals is dedicated to upholding the highest
standards of environmental stewardship, ensuring ongoing
compliance with applicable legislation and regulatory
obligations. Continuous improvement and maintenance of
environmental monitoring and compliance systems is a key
component of the successful restart of the Nifty Copper
Operation.
During the reporting period, environmental approvals and
compliance works for the cathode project progressed,
focusing on Heap Leach North and the new Acid Storage
Facility. Activities included re-lining of the W-Drain
and associated Heap Leach North ponds to enable the
eventual recommencement of irrigation. Preparation and
operational readiness works are also underway to support
the successful commencement of construction for Heap
Leach South, as well as refurbishment of the SX–EW facility.
Cyprium Metals continues to maintain active engagement
with regulators and stakeholders, including but not
limited to the Department of Water and Environmental
Regulation (DWER), the Department of Mines, Petroleum
and Energy (DMPE), the Department of Energy and
Economic Diversification (DEED), and local community
representatives, ensuring alignment with stakeholder
expectations.
6
ASX: CYM | OTCQB: CYPMF Cyprium Metals I INTERIM FINANCIAL REPORT
Share Consolidation
Cyprium completed a 1 for 10 share consolidation during the period,
following shareholder approval at the Extraordinary General Meeting on
13 October 2025. Trading on a post consolidation basis commenced on 28
October 2025, simplifying the capital structure and improving the alignment
of the Company’s share register.
Director Appointments
The Company further strengthened its governance framework with the
appointment of two experienced Non Executive Directors, Jim Simpson
and Amber Banfield, whose elections were endorsed by shareholders at the
Annual General Meeting held on 20 November 2025. Former Non Executive
Director Ross Bhappu retired at the close of that meeting.
Senior Loan Facility Refinanced
Cyprium also advanced its funding strategy by refinancing its existing
US$27.3 million senior secured loan facility. The new facility, provided by
Nebari Natural Resources Credit Fund II LP, extends the loan maturity to
December 2029 and provides enhanced flexibility through the ability to pay
down and redraw principal.
Capital Raising
During the period, the Company completed a A$80 million capital raising
initiative comprising a two tranche placement and a fully underwritten
entitlement offer at an issue price of A$0.028 per share, with both
components finalised in October 2025.
On 23 January 2026, the Company announced an A$41 million equity capital
raising comprising a A$36 million Institutional placement and a A$5 million
fully underwritten entitlement offer with the first tranche being completed
by 2 February 2026
Additional information can be found online at www.cypriummetals.com and
in the Company’s ASX disclosure.
Corporate Update
In August 2025 the
Company completed
an A$80m capital
raising initiative
7
ASX: CYM | OTCQB: CYPMF Cyprium Metals I INTERIM FINANCIAL REPORT
Directors
The following persons were directors of Cyprium during the year and up to the date of
this report:
DIRECTOR ROLE CHANGES IN TENURE
M Fifield Executive Chairman
Non-Executive Chairman
Appointed 16 February 2024
Appointed 13 September 2023
G Comb Non-Executive Director Transitioned from Non-Executive Chairman to
Non-Executive Director on 13 September 2023
S Perry Non-Executive Director Appointed 18 April 2024
A Banfield Non-Executive Director Appointed 20 November 2025
J Simpson Non-Executive Director Appointed 20 November 2025
R Bhappu Non-Executive Director Resigned 20 November 2025
Significant Events After Reporting Date
On 23 January 2026, the Company announced an A$41 million equity capital raising
comprising A$36 million Institutional placement and A$5 million fully underwritten
entitlement offer. On 2 February 2026, the Company completed tranche 1 of the placement
issuing 68,553,846 ordinary shares at an issue price of $0.52 raising $35.6 million. Tranche
2 of the placement, comprising 676,924 ordinary shares to be issued to Director’s of the
Company, was approved at a meeting of the Company’s shareholders on 9 March 2026.
Auditor’s Independence Declaration
Section 307C of the Corporations Act 2001 requires our auditors to provide the Directors of
the Company with an Independence Declaration in relation to the review of the half-year
financial report. This Independence Declaration is set out on page 27 and forms part of
this Directors’ Report for the half-year ended 31 December 2025.
Rounding
The amounts contained in this report have been rounded to the nearest ‘000 (unless
otherwise stated) under the option available to the Company under ASIC Corporations
Instrument 2016/91. The company is an entity to which the legislative instrument applies.
J Matthew Fifield | Executive Chairman
Perth, WA
12 March 2026
8
ASX: CYM | OTCQB: CYPMF Cyprium Metals I INTERIM FINANCIAL REPORT
AUDITOR’S INDEPENDENCE DECLARATION
As lead auditor for the review of the consolidated financial report of Cyprium Metals Limited for the
half-year ended 31 December 2025, I declare that to the best of my knowledge and belief, there
have been no contraventions of:
a) the auditor independence requirements of the Corporations Act 2001 in relation to the review;
and
b) any applicable code of professional conduct in relation to the review.
Perth, Western Australia
12 March 2026
D B Healy
Partner
9
Condensed Consolidated Statement
of Profit or Loss and Other
Comprehensive Income
for the six months ended 31 December 2025
Note
31-Dec-2025
$’000
31-Dec-2024
$’000
Continuing Operations
Interest income 529 61
Other income 3 10,344 1,014
Employee expenses (2,167) (3,470)
Management and administrative expenses (3,270) (2,876)
Operations and development expenses (6,001) (2,939)
Share-based payments – performance rights (1,255) (850)
Depreciation and amortisation (414) (595)
Provision for Inventory obsolescence 4 (3,500) -
Interest and finance charges (2,832) (2,322)
Fair value gain/(losses) 5 450 2,860
Loss on convertible notes amendment 14 - (724)
Amortisation arrangement fees (417) (1,526)
Gain/(Loss) on foreign exchange 435 (3,029)
Loss on sale of exploration tenements - (3,125)
Exploration expenditure write down 9 (6) -
Loss before income tax (8,104) (17,521)
Income tax benefit - -
Net loss for the year from continuing operations (8,104) (17,521)
Other comprehensive income - -
Total comprehensive loss for the year (8,104) (17,521)
Loss per share
Basic loss per share (cents per share) 16 (2.45) (1.14)
The above Condensed Consolidated Statement of Profit or Loss and Other Comprehensive Income should be read in
conjunction with the accompanying notes.
10
ASX: CYM | OTCQB: CYPMF Cyprium Metals I INTERIM FINANCIAL REPORT
Condensed Consolidated
Statement of Financial Position
as at 31 December 2025
Note
31-Dec-2025
$’000
30 June 2025
$’000
Current Assets
Cash and cash equivalents 75,014 13,658
Receivables 905 345
Inventories 4 2,184 6,140
Financial assets at fair value 6 1,230 780
Other assets 932 177
Total Current Assets 80,265 21,100
Non-Current Assets
Right-of-use asset 7 406 609
Property plant and equipment 8 139,050 126,982
Deferred exploration and evaluation expenditure 9 32,931 30,642
Security deposits 10 7,107 7,107
Total Non-Current Assets 179,494 165,340
Total Assets 259,759 186,440
Current Liabilities
Trade and other payables 11 11,458 3,774
Deferred revenue - 2,475
Lease liabilities 12 545 577
Total Current Liabilities 12,003 6,826
Non-Current Liabilities
Lease liabilities 12 310 561
Borrowings 13 38,740 41,347
Convertible notes 14 21,336 17,919
Provisions 15 33,117 34,337
Total Non-Current Liabilities 93,503 94,164
Total Liabilities 105,506 100,990
Net Assets 154,253 85,450
Equity
Issued capital 16 391,314 315,737
Reserves 17 8,231 8,107
Convertible notes - equity component 15,720 15,720
Accumulated losses (261,012) (254,114)
Total Equity 154,253 85,450
The above Condensed Consolidated Statement of Financial Position should be read in conjunction with the accompanying
notes.
11
ASX: CYM | OTCQB: CYPMF Cyprium Metals I INTERIM FINANCIAL REPORT
Condensed Consolidated
Statement of Changes in Equity
for the six months ended 31 December 2025
Issued
capital
$’000
Accumulated
losses
$’000
Convertible
borrowings-
equity
component
$’000
Reserves
$’000
Total
$’000
Balance at 1 July 2024 301,009 (227,958) 8,748 7,727 89,526
Loss for the period - (17,521) - - (17,521)
Total comprehensive loss for the year - (17,521) - - (17,521)
Transactions with owners in their capacity as owners
Shares issued 5,200 - - - 5,200
Options issued - - - 465 465
Share based payments - - - 425 425
Convertible notes amendment - - 6,972 - 6,972
Cost of Issues (136) - - - (136)
Balance at 31 December 2024 306,073 (245,479) 15,720 8,617 84,931
Balance at 1 July 2025 315,737 (254,114) 15,720 8,107 85,450
Loss for the period - (8,104) - - (8,104)
Total comprehensive loss for the year - (8,104) - - (8,104)
Transactions with owners in their capacity as owners
Shares issued 80,019 - - - 80,019
Lapsed Options - 1,206 - (1,206) -
Share based payments - - - 1,255 1,255
Purchase Rights Issued 75 75
Cost of Issues (4,442) - - - (4,442)
Balance at 31 December 2025 391,314 (261,012) 15,720 8,231 154,253
The above Condensed Consolidated Statement of Changes in Equity should be read in conjunction with the accompanying
notes.
12
ASX: CYM | OTCQB: CYPMF Cyprium Metals I INTERIM FINANCIAL REPORT
Condensed Consolidated
Statement of Cash Flows
for the six months ended 31 December 2025
Note
31-Dec-2025
$’000
31-Dec-2024
$’000
Cash flows from operating activities
Payments to suppliers and employees – continuing operations (10,457) (8,686)
Interest paid on lease liabilities (27) (40)
Interest on borrowing (3,681) (2,282)
Interest received 529 61
Other income received 3,203 -
Net cash (used in) operating activities (10,433) (10,947)
Cash flows from investing activities
Payment for plant and equipment (4,529) (4,063)
Payments for exploration expenditure (1,690) (1,796)
(Payments for)/refund of security deposits - (28)
Proceeds from asset sales 5,302 1,014
Net cash (used in) investing activities (917) (4,873)
Cash flows from financing activities
Proceeds from issue of shares 80,019 5,200
Proceeds from loan 13 41,852 45,247
Repayment of loan 13 (41,788) (21,875)
Payments for loan issue costs 13 (2,134) (1,392)
Payments for convertible notes amendment 14 - (5,000)
Payments for share issue costs (4,442) (137)
Payment of lease liabilities 12 (283) (252)
Net cash provided by financing activities 73,224 21,791
Net increase in cash and cash equivalents 61,874 5,971
Cash and cash equivalents at the beginning of the period 13,658 7,325
Effect of exchange rate changes on cash and cash equivalents (518) 910
Cash and cash equivalents at the end of the period 75,014 14,206
The above Condensed Consolidated Statement of Cash Flows should be read in conjunction with the accompanying notes.
13
ASX: CYM | OTCQB: CYPMF Cyprium Metals I INTERIM FINANCIAL REPORT
1. Corporate Information
The financial report of Cyprium Metals Limited (“Cyprium
Metals” or “the Company”) and its controlled subsidies
(“the Group”) for the six months ended 31 December 2025
was authorised for issue in accordance with a resolution of
the Directors on 12 March 2026.
Cyprium Metals is a company limited by shares incorporated
in Australia whose shares are publicly traded on the
Australian Securities Exchange. The nature of the
operations and the principal activities of the Company
are described in the Directors’ Report and Review of
Operations.
2. Summary of Material
Accounting Policies
(a). Basis of Preparation
These general-purpose financial statements for the six
months ended 31 December 2025 have been prepared
in accordance with applicable accounting standards
including AASB 134” Interim Financial Reporting” and
the Corporations Act 2001. Compliance with AASB
134 ensures compliance with IAS 34 “Interim Financial
Reporting”.
These interim financial statements for the six months
ended 31 December 2025 do not include all the notes
of the type normally included in annual financial
statements and therefore cannot be expected to
provide as full an understanding of the financial
performance, financial position and financing and
investing activities of the Group as the full financial
statements. Accordingly, these interim financial
statements for the six months ended 31 December 2025
are to be read in conjunction with the annual financial
statements for the year ended 30 June 2025 and any
public announcements made by Cyprium Metals Limited
during the half-year reporting period in accordance
with the continuous disclosure requirements of the
Corporations Act 2001.
The half-year report has been prepared on an accruals
basis and is based on historical costs. For the purpose
of preparing the half-year financial report, the half-year
period has been treated as a discrete reporting period.
Notes to the Consolidated
Interim Financial Report
for the six months ended 31 December 2025
(b). Compliance Statement
The financial report complies with Australian
Accounting Standards, which include Australian
equivalents to International Financial Reporting
Standards (AIFRS). Compliance with AIFRS ensures
that the financial report, comprising the financial
statements and notes thereto, complies with
International Financial Reporting Standards (IFRS).
(c). Critical Accounting Estimates and Judgements
The application of accounting policies requires the use
of judgements, estimates and assumptions about the
carrying values of assets and liabilities that are not
readily apparent from other sources. The estimates
and associated assumptions are based on historical
experience and other factors that are considered
to be relevant. Actual results may differ from these
estimates. The estimates and underlying assumptions
are reviewed on an ongoing basis. Revisions are
recognised in the year in which the estimate is revised
if it affects only that year, or in the year of the revision
and future years if the revision affects both current
and future years.
Share-Based Payments
The Group measures the cost of equity-settled
transactions with employees by reference to the fair
value of the equity instruments at the date at which
they are granted. The fair value is determined using an
appropriate valuation methodology.
The Group measures the cost of cash-settled share-
based payments at fair value at the grant date using
a valuation model taking into account the terms and
conditions upon which the instruments were granted.
14
ASX: CYM | OTCQB: CYPMF Cyprium Metals I INTERIM FINANCIAL REPORT
Deferred Tax
In accordance with the Group’s accounting policies
for deferred taxes, a deferred tax asset is recognised
for unused tax losses only if it is probable that future
taxable profits will be available to utilise those losses.
Determination of future taxable profits requires
estimates and assumptions as to future events and
circumstances, in particular, whether successful
development and commercial exploitation, or
alternative sale, of the respective areas of interest will
be achieved. This includes estimates and judgements
about commodity prices, ore reserves, exchange
rates, future capital requirements, future operational
performance, and the timing of estimated cash flows.
Changes in these estimates and assumptions could
impact on the amount and probability of estimated
taxable profits and accordingly the recoverability of
deferred tax assets.
The Group has not recognised a net deferred tax asset
for temporary differences and tax losses as at 31
December 2025 on the basis that the ability to utilise
these temporary differences and tax losses cannot yet
be regarded as probable.
Deferred Exploration and Evaluation Expenditure
Deferred exploration and evaluation expenditure
has been capitalised on the basis that the Group will
commence commercial production in the future, from
which time the costs will be amortised in proportion to
the depletion of the mineral resources. Key judgements
are applied in considering costs to be capitalised which
includes determining expenditures directly related to
these activities and allocating overheads between
those that are expensed and capitalised.
In addition, costs are only capitalised that are expected
to be recovered either through successful development
or sale of the relevant mining interest. Factors that
could impact the future commercial production at
the mine include the level of reserves and resources,
future technology changes, which could impact the
cost of mining, future legal changes, and changes
in commodity prices. To the extent that capitalised
costs are determined not to be recoverable in the
future, they will be written off in the year in which this
determination is made.
Mine Rehabilitation Provision
Closure and rehabilitation provisions are initially
recognised when an environmental disturbance first
occurs. The mine site provisions are an estimate of
the expected value of future cash flows required to
rehabilitate the relevant site using current restoration
standards and techniques and taking into account
risks and uncertainties. Individual site provisions are
discounted to their present value using discount rates
aligned to the estimated timing of cash outflows.
The closure and rehabilitation provision is reviewed at
each reporting date to assess if the estim