Cyprium Metals Limited (CYM or the Company) is pleased to announce the completion
and publication of the Nifty Surface Mine Scoping Study (Study).
Highlights include:
•
Optimal pit determined to contain 70mt of sulphide ore at 0.9% Cu for
expected 570,000 tonnes of recovered copper through concentrator over
life of mine
•
Truck-shovel surface mine generates approx. 4.5 mtpa ore feed per year
•
Expected average annual production of 36,000 tonnes of contained copperin-concentrate through expanded plant
•
Expected capital expenditure of A$175 million for plant refurbishment,
expansion and ancillary site capital, excluding cost of mobile fleet
•
Preliminary design allows for 89% of LOM waste disposal requirements to
be withing current areas permitted for disturbance
•
NPV8% of $880 million and IRR of 46% at copper price of AUD 13,000 1
•
Board approval to advance to Pre-Feasibility Study
“This is a meaningful step for Cyprium that consolidates months of work,” said Executive
Chair Matt Fifield. “The opportunity is clear. This Study outlines the high-level plan for
accessing the large sulphide resource at Nifty. A relatively large truck-shovel surface
mine enables us to best recover the significant resources at Nifty. A moderate investment
in the brownfield processing plant capacity can nearly double the potential throughput of
the plant, enabling the surface mine to produce around 36,000 tonnes of copper metal
per year by matching strong mine design, right equipment selection and expanded
processing capacity. We will refine this plan in the coming months.”
Fifield continued, “This Study is focused on the surface mine opportunity at Nifty.
Consider the surface mine opportunity described in the Study to be a standalone project
and designed without any interaction with or dependency on the copper cathode project,
which is a separate workstream dedicated to producing near-term copper through a
restart of the adjacent cathode plant. Re-start plans for the copper cathode project are
advanced and will be publicly disclosed once finalised.”
1
Assumes adoption of a contractor mining model. See attached Study for more information.
ABN 48 002 678 640
T +61 8 6374 1550
ASX: CYM
Level 1, 437 Roberts Road
Subiaco, WA, 6008
www.cypriummetals.com
Cautionary Statements
This Scoping Study has been undertaken for the purposes of demonstrating the business case to support the
recommencement of surface mining and copper concentrator operations at the Nifty Copper Operation.
It is a preliminary technical and economic study of the potential viability of the Nifty Copper Operation. It is based on
low-level technical and economic assessments that are not sufficient to support the estimation of ore reserves.
A level of accuracy of +/-30% is applicable in accordance with Scoping level accuracy. Further evaluation work and
appropriate studies are required before Cyprium will be in a position to estimate any ore reserves or to provide any
assurance of an economic development case.
The project economics in this Study are derived solely from the mining and processing of Measured and Indicated
Mineral Resources. The small amount of Inferred Mineral Resources mined is treated as mineralised waste and does
not contribute to the project economics.
The Scoping Study is based on the material assumptions as outlined. These do not include the availability of funding.
While Cyprium considers all of the material assumptions to be based on reasonable grounds, there is no certainty that
they will prove to be correct or that the range of outcomes indicated by the Scoping Study will be achieved.
Funding in the order of A$175 million (Excluding mining) will likely be required to achieve the range of outcomes
indicated in the Scoping Study.
Investors should note that there is no certainty that Cyprium will be able to raise this sum of funding when needed. It is
possible or likely (as the case may be) that the required funding may only be available on terms that may be dilutive to
or otherwise affect the value of Cyprium’s existing shares.
CYM considers that its prospects of securing funding to undertake the large surface mine are strong for the following
reasons:
•
•
•
•
The project economics are attractive (see Scheduling Outcomes table in Executive Summary)
The amount of pre-production capital expenditure is relatively modest as the Nifty mine is a brownfields site
with established mine infrastructure (see Scheduling and Financial Inputs and Constraints table in Executive
Summary)
The risk profile is considered low to comparable new copper projects. Nifty is in Western Australia, a stable
and well-regulated mining jurisdiction. The orebody is proven as the mine operated for 24 years and
produced 750 kt of copper. All of the project economics are derived from material within the higher
confidence Measured and Indicated Mineral Resource categories
Demand for copper is very strong. Short and long-term copper futures prices support undertaking a project
financing of this scale
Cyprium considers all the company's project financing options, including equity, debt, joint ventures, offtake financing,
royalties, contractor financing, equipment financing and hybrid financing structures available to the company. Cyprium
has confirmed that it is engaged in discussions with potential financiers.
Given the uncertainties involved, investors should not make any investment decisions based solely on the results of this
Scoping Study.
Cyprium Metals (ASX:CYM)
Page 2
Cyprium and engineering partner MEC Advisory (MEC) developed this Study in two
distinct phases: Optimization and Scoping Study. Both phases were built off of the March
2024 Mineral Resource Estimate which outlined one million tonnes of contained metal as
follows:
Table 1. Nifty Copper Deposit March 2024 Mineral Resource Estimate (MRE) above 0.25% Cu.
JORC 2012 CATEGORY
TOTAL
MEASURED
OXIDISATION
TYPE
Kt
CuCut
%
INDICATED
Cu t
INFERRED
Kt
CuCut
%
Cu t
Kt
CuCut
%
Cu t
Kt
CuCut
%
Cu t
OXIDE, SAP &
TRANS
2,603
1.02
18
17,519
0.74
130,081
849
0.70
5,902
20,971
0.78
162,000
SULPHIDE
35,452
0.98
347,610
63,395
0.80
505,685
5,199
0.43
22,479
104,047
0.84
876,000
TOTAL
38,055
0.98
374,081
80,915
0.79
635,766
6,048
0.47
28,381
125,018
0.83
1,038,000
The figure below shows the Nifty resources by classification and the ultimate pit shell
design.
Figure 1. Wireframe of the Nifty Mineral Resource with the LSM pit shell
Phase 1: Optimisation
The first step of the work released today was an optimisation study that determined the
best-fit ultimate pit geometry and sequencing to recover the best part of the contained
resource in the highest net present value. The optimal pit selected contains ~70 million
tonnes of sulphide ore at 0.9% Cu and 250 million BCM of total material moved. All of the
Cyprium Metals (ASX:CYM)
Page 3
material processed in this mining schedule is classified as Measured and Indicated
Mineral Resources.
Significant inputs for this optimisation phase included:
•
•
•
•
•
$13,000 per tonne copper
Ore feed rate of 3.5 mtpa – a slight expansion to the brownfield plant’s nameplate
ore feed rate capacity of 2.8 mtpa
400 tonne excavator fleet
Preliminary mining costs as supplied by a 3rd party contractor
All oxide resources treated as mineralised waste – i.e. not included in economics
of study
The balance of the assumptions and outcomes from this phase can be viewed in the
technical documentation attached to this announcement.
“The larger part of the existing resources are located at the bottom of the syncline,” said
Chris Catania, CEO of engineering partner MEC Mining and project lead. “We undertook
a significant amount of work during this optimisation phase to study and plan the
sequence of waste movement in conjunction with ore recovery. This approach is
designed to help cover the costs of early waste movement.”
This optimisation phase determined the economic cutoff of the mine given the
assumptions used and looked at different intermediate pit shells to sequence the mine
plan from initial movements to economic cutoff depth.
The designed ore feed rate of 3.5 mtpa, versus the nameplate capacity of the plant of 2.8
mtpa, was supported by work from an independent engineering group. The original plant
was designed for a much higher-grade ore that was targeted by the underground
operations, and consequently the back end of the plant is capable of processing higher
volumes of lower grade ore feed. A new primary crusher is required, and was matched
with existing milling capacity to reach the 3.5 mtpa throughput rate used in the
optimisation.
Optimisation stage work focused on developing the ultimate pit, and the progressive pit
shells to balance ore exposure with waste movement. The cross sections below show
the different cutbacks that allow for access to incremental ore, and the plan view below
shows the outer edge of the various stages of the pit development.
Cyprium Metals (ASX:CYM)
Page 4
Figure 2. Oblique Cross Section of Optimisation Shells
Figure 3. Oblique Cross Section of Optimisation Shells
Phase 2: Scoping Study
The second step of the Study involved a scoping exercise to provide a more detailed
analysis of mine scheduling and projected economics. There were a few important
differences in the design basis of the Scoping Study phase relative to those used in the
Optimisation Phase.
•
•
Ore feed rate was increased to 4.5 mtpa, which was the right fit for using three
600-tonne class primary waste excavators.
Capital at the plant was increased over the optimization phase to add additional
milling and crushing capacity necessary to process 4.5 mtpa ore.
Cyprium Metals (ASX:CYM)
Page 5
•
•
•
•
Mining cost estimates were done from a first-principal basis using MEC
benchmark data. For the contractor case appropriate capital and operating
margins were added.
All mining activity rates were adjusted in areas that are influenced by previous
mining activities based upon feedback from a 3rd party contractor with
experience operating surface mines in similar situations.
Three cost cases were examined: Contractor, Owner-Operator using purchased
mobile equipment, and Owner-Operator using OEM financing at prevailing
commercial rates.
All oxide resources continued to be treated as mineralized waste.
Optimal pit shells were studied and sequenced on a bench-by-bench basis through a
Vulcan mine optimizer taking into account mine design considerations such as ramp
widths, geotechnical inputs, fleet sizing, and working areas. Stable wall conditions were
engineered into the open-pit mine designs and incorporate a level of conservatism
relating to the interaction of mining activities with the sinkholes and underground
workings. Cyprium notes that the Company will utilise proven and industry standard
practises for safely mining through the sinkholes and underground workings.
Preliminary waste emplacement designs were developed to maximize the use of areas
already permitted for disturbance, leading to 89% of LOM waste being placed in these
areas. Costs for waste haulage were developed at a level sufficient for a scoping study.
“As we worked on the Study, it was clear that there is a strong basis from which to
increase the overall throughput of the plant and mine,” said Catania. “This increase in
rate reduced total mine life from 22 years to 17 years and created economies of scale on
a number of levels. We had detailed information around expansion of the concentrator
that allowed for a good match of mining equipment and processing capacities.”
“The economics outputs are compelling,” said Fifield. “With a NPV 8% of $880 million and
an IRR of 46% at A$13,000 per tonne copper, this scoping study shows that a surface
mine at Nifty can put meaningful copper units into a market that requires them. I’m
pleased with the study, the rigor, and both team and individual efforts that went into this
work.”
Board Approval to Progress to PFS
The board endorsed this work and has authorized bringing this plan to a higher level of
confidence level through a Pre-Feasibility Study. This next phase of work will develop the
Study work to a sufficient point of confidence to support a declaration of a reserve via a
Reserve Report.
A Pre-Feasibility Study is expected to follow the Reserve Report and will seek to
incorporate additional scenarios around the base plan of the Study. With the advantage
of on-site natural gas, Cyprium believes that there will be a likely reduction in mining costs
via an alternate fuel scenario, and a similar reduction in projected carbon footprint. Other
Cyprium Metals (ASX:CYM)
Page 6
planned work includes pre-strip scenarios and further optimisation of waste haulage
strategy.
Fifield concluded, “Nifty has many advantages that de-risk the ultimate project execution:
brownfield site with existing infrastructure, a large resource that can be processed
through the on-site concentrator, the choice of world class suppliers and partners in
Western Australia, and existing permits that facilitate speed to market. It’s clear that we
have an economic project concept. With continued execution by the Cyprium team and
its strong engineering partners we expect this Study to advance quickly towards
execution planning.”
This ASX announcement was approved and authorised by the Board of Cyprium
Metals Limited.
Further information:
Matt Fifield
John Gardner
Executive Chair
matt.fifield@cypriummetals.com
Investor and Media Relations
communications@cypriummetals.com
About Cyprium Metals Limited
Cyprium Metals Limited (ASX: CYM) is an ASX-listed Australian copper company. Its flagship property is the Nifty
Copper Mine in Western Australia, which previously produced significant copper from both oxide and sulphide
resources. Cyprium is focused on redeveloping Nifty, which has the advantage of significant invested capital, data from
a long operating history, large-scale resources, current operational approvals, and recent investment in the property.
The Company’s other assets include significant copper-focused properties in the Paterson and Murchison Provinces,
including multiple defined resources.
Visit www.cypriummetals.com for further information.
Competent Person Statement
The information in this report that relates to the estimation and reporting of the Nifty Mineral Resource Estimate dated
14 March 2024 is an accurate representation of the recent work completed by MEC Advisory Pty Ltd. Mr Dean O’Keefe
has compiled the work for MEC Advisory and is Manager of Resources for MEC Mining and a Fellow of the Australasian
Institute of Mining and Metallurgy (#112948). Mr O’Keefe has sufficient experience which is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which she is undertaking to qualify as a
Competent Person (CP). Mr O’Keefe consents to the inclusion in the release of the of the matters based on this
information in the form and context in which it appears.
References to Mineral Resources
The information in this announcement that relates to Mineral Resources for Nifty was previously reported by the
Company in its announcement dated 14 March 2024. The Company confirms that it is not aware of any new information
or data that materially affects the information included in those market announcements and, in the case of Mineral
Resources, all material assumptions and technical parameters underpinning the estimates continue to apply and have
not materially changed. The Company confirms that the form and context in which the Competent Person’s findings
are presented have not been materially modified from the original market announcement.
Cyprium Metals (ASX:CYM)
Page 7
Cyprium Metals Limited
Nifty Surface Mine Scoping Study May 2024
Cyprium Metals Ltd
Nifty Surface Mine Scoping Study
May 2024
Cyprium Metals Ltd | Page i
Cyprium Metals Limited
Nifty Surface Mine Scoping Study May 2024
FORWARD LOOKING STATEMENT
This document may contain certain forward-looking statements. Such statements are only predictions based on
certain assumptions and involve known and unknown risks, uncertainties and other factors, many of which are
beyond the company’s control. Actual events or results may differ materially from the events or results expected
or implied in any forward-looking statement.
The inclusion of such statements should not be regarded as a representation, warranty or prediction with
respect to the accuracy of the underlying assumptions or that any forward-looking statements will be or are
likely to be fulfilled. Cyprium undertakes no obligation to update any forward-looking statement to reflect events
or circumstances after the date of this document (subject to securities exchange disclosure requirements).
The information in this document does not take into account the objectives, financial situation or particular
needs of any person or organisation. Nothing contained in this document constitutes investment, legal, tax or
other advice.
| Page i
Cyprium Metals Limited
Nifty Surface Mine Scoping Study May 2024
CAUTIONARY STATEMENT
This Scoping Study has been undertaken for the purposes of demonstrating the business case to support the
recommencement of surface mining and copper concentrator operations at the Nifty Copper Operation.
It is a preliminary technical and economic study of the potential viability of the Nifty Copper Operation. It is
based on low-level technical and economic assessments that are not sufficient to support the estimation of ore
reserves.
A level of accuracy of +/-30% is applicable in accordance with Scoping level accuracy. Further evaluation work
and appropriate studies are required before Cyprium will be in a position to estimate any ore reserves or to
provide any assurance of an economic development case.
The Scoping Study is based on the material assumptions as outlined. These do not include the availability of
funding.
While Cyprium considers all of the material assumptions to be based on reasonable grounds, there is no certainty
that they will prove to be correct or that the range of outcomes indicated by the Scoping Study will be achieved.
Funding in the order of A$175 million (excluding mining) will likely be required to achieve the range of outcomes
indicated in the Scoping Study.
Investors should note that there is no certainty that Cyprium will be able to raise this sum of funding when
needed. It is possible or likely (as the case may be) that the required funding may only be available on terms that
may be dilutive to or otherwise affect the value of Cyprium’s existing shares.
CYM considers that its prospects of securing funding to undertake the large surface mine are strong for the
following reasons:
•
The project economics are attractive (see Scheduling Outcomes table in Executive Summary)
•
The amount of pre-production capital expenditure is relatively modest as the Nifty mine is a brownfields
site with established mine infrastructure (see Scheduling and Financial Inputs and Constraints table in
Executive Summary)
•
The risk profile is considered low to comparable new copper projects. Nifty is in Western Australia, a
stable and well-regulated mining jurisdiction. The orebody is proven as the mine operated for 24 years
and produced 750 kt of copper. 97% of Nifty’s Mineral Resources are in the higher confidence Measured
and Indicated categories
•
Demand for copper is very strong. Short and long-term copper futures prices support undertaking a
project financing of this scale
| Page ii
Cyprium Metals Limited
Nifty Surface Mine Scoping Study May 2024
Cyprium considers all the company's project financing options, including equity, debt, joint ventures, offtake
financing, royalties, contractor financing, equipment financing and hybrid financing structures available to the
company. Cyprium has confirmed that it is engaged in discussions with potential financiers.
Given the uncertainties involved, investors should not make any investment decisions based solely on the results
of this Scoping Study.
| Page iii
Cyprium Metals Limited
Nifty Surface Mine Scoping Study May 2024
EXECUTIVE SUMMARY
MEC Mining and Advisory (MEC) were engaged by Cyprium Metals (CYM) to undertake a scoping study to assess
the potential and size of a surface mining and processing operation at the Nifty Copper Operation (NCO)
targeting the copper sulphide resources based on the March 2024 Mineral Resource Estimate (MRE) as outlined
below.
JORC 2012 CATEGORY
OXIDISATION
TYPE
OXIDE, SAP &
TRANS
TOTAL
MEASURED
INDICATED
Kt
CuCut
%
Kt
CuCut
%
Cu t
Kt
CuCut
%
Cu t
Kt
CuCut %
Cu t
2,603
1.02
18
17,519
0.74
130,081
849
0.70
5,902
20,971
0.78
162,000
Cu t
INFERRED
SULPHIDE
35,452
0.98
347,610
63,395
0.80
505,685
5,199
0.43
22,479
104,047
0.84
876,000
TOTAL
38,055
0.98
374,081
80,915
0.79
635,766
6,048
0.47
28,381
125,018
0.83
1,038,000
Numbers are rounded to reflect a suitable level of precision and may not sum due to rounding.
This work included optimisation (whittle style), preliminary designs and high-level schedules that indicate the
potential for the recommencement of the existing concentrator at Nifty to be fed from a long-life, large-scale
surface mining operation to produce saleable copper concentrate.
The study encompassed two parts: selecting the optimal pit size and geometry (Optimisation) and refining the
pit design through sequencing material movements at a bench level, including preliminary economic outcomes
at a scoping study level of accuracy (Scoping).
PIT OPTIMISATION
Pit optimisation was completed using a 3.5 mtpa concentrator feed rate, processing costs built from first
principles by Cyprium and mining rates and costs provided by a third-party contractor, including but not limited
to fixed and variable costs, productivity factoring based on areas impacted by historic underground mining and
areas affected by the sink holes.
The optimised pit contains ~77 million tonnes grading 0.91% to generate a 22-year mine life at a 3.5 mtpa feed
rate from the measured and indicated mineral resource outside the sinkholes. Oxide material was not
considered for either concentration or heap leaching in the optimisation; however, it provides an opportunity
to be considered in detailed scheduling.
A summary of the key inputs and outcomes of the optimisation are outlined in the table on the next page, along
with plan and sectional views of the optimisation shells.
| Page iv
Cyprium Metals Limited
Nifty Surface Mine Scoping Study May 2024
OPTIMISATION INPUTS AND OUTCOMES
Optimisation Input
Copper Price
Exchange Rate
Copper Price
NPV Discount Rate
Processing Cost - Weight Averaged
Mining Cost - Weight Averaged
Selling Cost
Capital
Maximum Concentrator Feed Rate
Maximum Sulphide Recovery
TMM Maximum Target
Concentrator Feed - Resource Classification
Concentrator Feed - Sink Holes
Concentrator Feed - Weathering Profile
UoM
US$/t Cu
A$:US$
A$/t Cu
%
A$/t
A$/t
A$/dTCu
A$M
mtpa
%
mtpa
Resource Classification
Ore / Waste
Oxidation
Optimisation Outcome
UoM
Life of Mine (LOM) Total Material Movement (TMM)
mt
Total Concentrator Feed
mt
Life of Mine (LOM) Head Grade
Cu%
Average Annual Copper in Concentrate Produced
t
Project Life
years
Undiscounted Cash Flow
A$M
NPV
A$M
Numbers are rounded to reflect a suitable level of precision and may not sum due to rounding.
Value
8,970
0.69
13,000
6
22.7
3.5
1,478
3.5
95
65
Measured and Indicated
Waste
Transitional and Fresh
Value
650
77%
0.91
32,000
22
2,500
1,000
SELECTED OPTIMISATION SHELLS
| Page v
Cyprium Metals Limited
Nifty Surface Mine Scoping Study May 2024
SECTION OF THE PROPOSED OPTIMISATION PIT SHELLS LOOKING NORTH
SECTION OF THE PROPOSED OPTIMISATION PIT SHELLS LOOKING EAST
| Page vi
Cyprium Metals Limited
Nifty Surface Mine Scoping Study May 2024
MINE DESIGN, SCHEDULING AND PROCESS SELECTION
Following the designation of the optimal pit, MEC undertook preliminary mine designs and high-level scheduling
to assess the overall economics. Four initial ore feed rates were considered: 2.8 mtpa, 3.5 mtpa, 4.5 mtpa and
6.0 mtpa. These targeted feed rates were designated by Cyprium and matched Cyprium’s assessment of the
step changes in concentrator throughput capacity. MEC and Cyprium reviewed the target cases and focused on
3.5 mtpa and 4.5 mtpa as the most likely cases. A high-level summary of these cases is outlined in the table
below.
SCOPING STUDY MINE SIZE PARAMETERS
Processing Plant Capacity
Approximate Life of Mine
Concentrator Expansion
Required
Excavator Class (Tonne)
Truck Class (Tonne)
Added Risks to the
Expanded Cases
2.8 mtpa
27 Years
Base Case
3.5 mtpa
22 Years
Crushing
400
190
Base Case
400
190 / 230
Few
4.5 mtpa
17 Years
Crushing and 2nd Mill
Line
600
230
Incremental upfront
capital, working space
requirement for larger
excavators
6.0 mtpa
13 Years
Complete duplication
of 3.5 mtpa option
600 / 800
230 / 360
Same as 4.5 plus
additional construction
risk, supply chain risk
on ultra-class
equipment, specialised
operators and
maintenance
With the target optimal mine sizes being 4.5 mtpa case, MEC undertook preliminary mine scheduling
incorporating ramp widths to accommodate the 4.5 mtpa case.
SCHEDULING
MEC used internal benchmarking data to build up an owner-operator model from first principles and financially
scheduled this in line with a contractor mining model based on the costs used in the optimisation.
Cyprium provided a capital estimate of A$175 million to refurbish and upgrade the current plant to recommence
processing operations at a 4.5mtpa throughput. This was based on an order of magnitude estimate deemed
sufficient by MEC to meet scoping study requirements.
| Page vii
Cyprium Metals Limited
Nifty Surface Mine Scoping Study May 2024
A summary of the inputs for the schedule and the financial analysis is outlined below.
SCHEDULING AND FINANCIAL INPUTS AND CONSTRAINTS
Scheduling and Financial Inputs and Constraints
Mining Model
Mining Capital Finance
Concentrator Feed
Copper Price
Exchange Rate
Copper price
NPV Discount Rate
Plant and NPI Capital
Maximum Sulphide Recovery
TMM Maximum Target
Concentrator Feed - Resource Classification
Concentrator Feed - Sink Holes
Concentrator Feed - Weathering Profile
UoM
Type
Type
mtpa
US$/t Cu
A$:US$
A$/t Cu
%
A$M
%
mtpa
Resource Classification
Ore / Waste
Oxidation
1
Owner Operator
Self
2
3
Owner Operator Contractor
OEM
Contractor
4.50
8,970
0.69
13,000
8
175
95
65
Measured and Indicated
Waste
Transitional and Fresh
As outlined below and over the page, analysis of the schedule outcomes indicates a positive outcome for the
project.
SCHEDULING OUTCOMES
Scheduling Outcomes
UoM
1
Mining Model
Type
Owner Operator
Mining Capital Finance
Type
Self
Mining Fleet Capital
A$M
227
Plant and NPI Capital
A$M
175
Total Capital
A$M
402
Mining Cost - Weight Averaged
A$/t
2.46
Processing Cost - Weight Averaged
A$/t
Selling Cost - Treatment, Refining, Mine to Port and Royalties
A$/dTCu
C1 Cost - Mining, Processing and Administration
A$/dTCu
6,627
C1 Cost - Mining, Processing and Administration
US$/dTCu
4,573
C1 Cost - Mining, Processing and Administration
US$/lbCu
2.08
LOM TMM
mt
Total Concentrator Feed
mt
Life of Mine (LOM) Head Grade
Cu%
Average Annual Copper in Concentrate Produced
t
Project Life
Years
Undiscounted Cash Flow
A$M
2,700
NPV (8%)
A$M
910
IRR
%
35
Numbers are rounded to reflect a suitable level of precision and may not sum due to rounding.
2
Owner Operator
OEM
175
175
2.67
21.83
1,478
6,891
4,755
2.16
745
70
0.86
36,000
17
2,730
1,000
56
3
Contractor
Contractor
175
175
2.94
7,223
4,984
2.27
2,530
880
46
| Page viii
Cyprium Metals Limited
Nifty Surface Mine Scoping Study May 2024
Copper in Concentrate Produced (dTCu)
44,700
45,000
42,400
40,600
40,300
38,700 38,900
40,000
36,700
35,900
35,200
36,300 35,900
35,000
29,700 30,100 29,600
29,300
30,000
dTCu
25,000
18,600
20,000
15,000
10,000
5,600
5,000
0
Y0
Y1
Y2
Y3
Y4
Y5
Y6
Y7
Y8
Y9
Y10
Y11
Y12
Y13
Y14
Y15
Y16
Y17
Numbers are rounded to reflect a suitable level of precision and may not sum due to rounding.
FUTURE WORK
In addition, this study informed the likely limits of surface mining operations, identified gaps in existing data,
and outlines work streams to help guide future studies including but not limited to:
•
Infill resource drilling and further MRE review
•
Geotechnical drilling, modelling and assessment
•
Economic analysis and production scaling assessment
•
Additional processing strategies for oxide material
•
Mine planning optimisation to maximise early mill throughput
•
Operational readiness requirements relating to potential mining around the sinkholes and the historic
underground workings
•
Carbon footprint analysis
•
Potential use of natural gas utilising the onsite availability of gas for fuel in the mining fleets
•
Review of alternate waste haulage methods, including in and expit crushing and conveying
The scoping study demonstrates that a surface mining strategy can deliver a substantial net present value (NPV)
under the disclosed assumptions. Financial analysis was assessed internally with Cyprium and deemed
| Page ix
Cyprium Metals Limited
Nifty Surface Mine Scoping Study May 2024
sufficiently positive in value, rate of return and confidence to justify the advancement of study phases into prefeasibility study (PFS) stage.
| Page x
Cyprium Metals Limited
Nifty Surface Mine Scoping Study May 2024
TABLE OF CONTENTS
FORWARD LOOKING STATEMENT ..................................................................................................................... I
CAUTIONARY STATEMENT ............................................................................................................................... II
Share your feedback
Discover