ASX: CYM | 29 AUGUST 2025
AMENDED CAPITAL RAISE PRESENTATION
As requested by the ASX, Cyprium Metals Limited (ASX: CYM / OTCQB: CYPMF) (Cyprium or the
Company) attaches an amended version of the presentation lodged with the ASX on 28 August 2025 (refer
announcement titled “Capital Raise Presentation”).
Slide 14 of the original presentation, titled “Cyprium Currently Dislocated vs Peers”, has been removed from
the updated version of the presentation, as it does not comply with ASX guidance on peer comparisons. The
Company has also removed supporting slide 24 from the appendices. Investors are advised not to make any
investment decision on the removed slides. There are no other changes to the original presentation.
This ASX announcement was authorised by the Cyprium Executive Chair.
For Enquiries:
Angus Miles | VP – Corporate Development and Investor Relations
communications@cypriummetals.com
+61 8 6374 1550
Dannika Warburton | Investor & Media Relations
investors@investability.com.au
+61 401 094 261
Follow Cyprium Metals:
Subscribe to Email alerts https://cypriummetals.com/contact-us/subscribe-to-email-alerts/
LinkedIn https://www.linkedin.com/company/cyprium-metals/
X https://x.com/CypriumMetals
Cyprium Metals Limited
ABN: 48 002 678 640
ASX: CYM
Level1, 437 Roberts Road
Subiaco WA 6008
AUSTRALIA
T +61 8 6374 1550
E communications@cypriummetals.com
W cypriummetals.com
UNLOCKING VALUE AT
NIFTY COPPER COMPLEX
ASYMMETRIC OPPORTUNITY FROM
BROWNFIELD ASSET BASE
INVESTOR PRESENTATION | AUGUST 2025
www.cypriummetals.com
www.cypriummetals.com
Not for release to US wire services or distribution in the United States
DISCLAIMERS AND FORWARD-LOOKING STATEMENTS
IMPORTANT: You must read the following before continuing. This Investor Presentation (“Presentation”) has been prepared by Cyprium Metals Limited (ABN 48 002 678 640) (“Cyprium” or “Company”) and authorised for release by the Executive Chair of Cyprium.
Summary information
By reviewing or retaining these materials, or attending or participating in this Presentation, you acknowledge and represent that you have read, understood and accepted the terms of this disclaimer. This Presentation contains summary information about Cyprium, and its activities current only at the date of this
Presentation. This Presentation is for information purposes only. The information in the Presentation is of a general nature only and does not purport to be complete. This Presentation should be read in conjunction with Cyprium’s most recent financial report and other periodic and continuous disclosure
announcements lodged with the Australian Securities Exchange (“ASX”) which are available at www.asx.com.au and also available on Cyprium’s website at www.cypriummetals.com.
Certain information in this Presentation has been sourced from Metals X Limited, the former owner of the Paterson Copper Portfolio and their representatives or associates. While steps have been taken to review that information, no representation or warranty, expressed or implied, is made as to its fairness,
correctness, completeness or accuracy. Certain information in this Presentation may have been obtained from research, surveys or studies conducted by third parties, including industry or general publications. Neither Cyprium nor its representatives have independently verified any such information sourced
from third parties or industry or general publications.
Not an offer
This Presentation is for information purposes and is not, and does not purport to be, a prospectus, product disclosure statement or any other offering document under Australian law or the law of any other jurisdiction (and will not be lodged with the Australian Securities and Investments Commission (“ASIC”) or
any foreign regulator). The information does not and will not constitute or form part of an offer, invitation, solicitation or recommendation in relation to the subscription, purchase or sale of securities in any jurisdiction and neither this Presentation nor anything in it shall form any part of any contract for the
acquisition of Cyprium shares. The distribution of this Presentation in jurisdictions outside Australia is restricted by law and you should observe any such restrictions, including those set forth in the “International Offer Restrictions” section of this presentation. Any failure to comply with such restrictions could
constitute a violation of applicable securities laws. In particular, this Presentation may not be released to US wire services or distributed in the United States. The Presentation does not constitute an offer to sell, or the solicitation of an offer to buy, any securities in the United States or any jurisdiction in which
such an offer would be illegal. The securities described in this Presentation have not been, and will not be, registered under the US Securities Act of 1933 or the securities laws of any state or other jurisdiction of the United States. Accordingly, the securities described in this Presentation may not be offered or
sold in the United States except in transactions exempt from, or not subject to, the registration requirements of the US Securities Act and applicable US state securities laws.
Not investment or financial product advice
This Presentation does not constitute financial product, investment, legal, taxation, accounting or other advice and is not intended to be used or relied upon as the basis for making an investment decision. This Presentation is not a recommendation by Cyprium or its advisers to acquire Cyprium shares or New
Shares. This Presentation has been prepared without taking into account the objectives, financial situation or needs of individuals. Before making an investment decision, prospective investors should consider the appropriateness of the information having regard to their own objectives, financial situation and
needs and seek financial, legal and taxation advice appropriate to their jurisdiction. Cyprium is not licensed to provide financial product advice in respect of Cyprium shares.
Effect of rounding
A number of figures, amounts, percentages, estimates, calculations of value and fractions in this Presentation are subject to the effect of rounding. Accordingly, the actual calculation of these figures may differ from the figures set out in this Presentation.
Past performance
Past performance information, including past share price performance of Cyprium and pro forma financial information, given in this Presentation is given for illustrative purposes only and should not be relied upon as (and is not) an indication of Cyprium’s (or anyone else’s) views on Cyprium’s future financial
performance or condition. Past performance of Cyprium cannot be relied upon as an indicator of (and provides no guidance as to) the future performance of Cyprium. Nothing contained in this Presentation nor any information made available to you is, or shall be relied upon as a promise, representation,
warranty or guarantee, whether as to the past, present or future.
Forward-looking statements
This Presentation contains certain “forward-looking statements” and comments about future events, including statements regarding Cyprium’s intent, belief or current expectations with respect to the Company’s business and operations, market conditions, results of operations and financial condition, and risk
management practices. The words “likely”, “expect”, “aim”, “should”, “could”, “may”, “anticipate”, “predict”, “believe”, “plan”, “estimate”, “will”, “believe”, “target” and other similar expressions are intended to identify forward-looking statements. Indications of, and guidance outlook on, future earnings or
financial position or performance are also forward-looking statements and include statements in this Presentation regarding the conduct and the future performance of Cyprium.
Forward-looking statements are provided as a general guide only and should not be relied upon as an indication or guarantee of future performance. Actual results, performance or achievements may differ materially from those expressed or implied in such statements and any projections and assumption on
which these statements are based. These statements may assume the success of Cyprium’s business strategies. The success of any of those strategies will be realised in the period for which the forward-looking statement may have been prepared or otherwise. Recipients of this Presentation are cautioned not
to place undue reliance on forward-looking statements, and except as required by law or regulation, none of Cyprium, its representatives or advisers assumes any obligation to update these forward-looking statements. No representation or warranty, express or implied, is made as to the accuracy, likelihood of
achievement or reasonableness of any forecasts, prospects, returns or statements in relation to future matters contained in this Presentation. The forward-looking statements are based on information available to Cyprium as at the date of this Presentation. Except as required by law or regulation (including the
ASX Listing Rules), none of Cyprium, its representatives or advisers undertakes any obligation to provide any additional or updated information whether as a result of a change in expectations or assumptions, new information, future events or results or otherwise. Indications of, and guidance or outlook on, future
earnings or financial position or performance are also forward-looking statements.
Cautionary Statements and Competent Person Statement
This document contains information from the Nifty Copper Complex - Pre-feasibility Study (PFS) which was released on 27 November 2024. Please refer to the cautionary statements in that document in detail. The information in the Pre-feasibility Study is supported by a Competent Person Statement, please
refer to the ASX release dated 27 November 2024 for further details.
References to Mineral Resources, Ore Reserves and PFS
The information in this announcement that relates to Mineral Resources for Nifty and Maroochydore was previously reported by the Company in announcements made in March, August and November 2024 (Nifty) and February 2025 (Maroochydore). The Company confirms that it is not aware of any new
information or data that materially affects the information included in those market announcements and, in the case of Mineral Resources and PFS, all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed. The Company confirms that the
form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.
JORC Code differs from reporting requirements in other countries
It is a requirement of the ASX Listing Rules that the reporting of ore reserves and mineral resources in Australia comply with the JORC Code. Investors outside Australia should note that while ore reserve and mineral resource estimates of the Company in this document comply with the JORC Code, they may
not comply with the relevant guidelines in other countries and, in particular, do not comply with (i) National Instrument 43 101 (Standards of Disclosure for Mineral Projects) of the Canadian Securities Administrators or (ii) Item 1300 of Regulation S-K, which governs disclosure of mineral reserves in registration
statements filed with the US Securities and Exchange Commission. Information contained in this presentation describing mineral deposits may not be comparable to similar information made public by companies subject to the reporting and disclosure requirements of other countries. You should not assume
that quantities reported as “resources” in this presentation will be converted to reserves under the JORC Code or any other reporting regime or that the Company will be able to legally and economically extract them.
2
CYPRIUM | AUGUST 2025 INVESTOR PRESENTATION
ACCELERATION OF NIFTY COPPER COMPLEX RESTART
Executing at speed to capitalize on asymmetric opportunity
1
Nifty, a former prolific producer currently at midlife, is a company-making asset with brownfield advantages of cost, time and scale
– Early shutdown of SXEW left an above-ground heap leach JORC resource of 12.7Mt at 0.43% Cu with added potential from unclassified materials
– Closure and abandonment of high-grade underground mine left surface-mineable reserve of 83Mt at 0.9% Cu next to a 3.0Mtpa feed rate concentrator
– Continued investment over time maintained key permits and left serviceable camp, airstrip, infrastructure
– Two processing plants (cathode and concentrator) are fit for purpose and require refurbishment to operate
2
CYM are rapidly executing a very simple plan to bring Nifty back online
– Reprocess the heap leach pads for early cash flow
– Refurbish the concentrator, build new surface mine to access a 20+ year reserve
– Ultimately, expand to process material from other regional prospects including Maroochydore
– We are supported by best-in-class partners who are vested in our success
3
The market has radically mispriced this. CYM has a compelling risk-reward profile against all comparable valuation points
– Currently trading at P / NPV of less than 0.1x
– Nov 24 PFS: A$1.1bn pre-tax NPV at US$4.25 copper and 0.71 FX
– Final steps to cash flow are in sight
The most asymmetric risk-reward to copper price on ASX?
3
CYPRIUM | AUGUST 2025 INVESTOR PRESENTATION
CYPRIUM METALS SNAPSHOT (ASX: CYM)
CORPORATE SUMMARY1
OWNERSHIP2
Share Price
A$0.030
Shares on issue
2,064m
Market Capitalisation
A$61.9m
Cash
A$16.2m
Senior Debt (maturity September 2028)
A$42.3m
Convertible Notes (redemption March 2028)
A$36.0m
Enterprise Value
A$124.0m
Flat Footed
19.9%
Other Shareholders
55.0%
Paradice 8.0%
Pacific Road Capital /
Matt Fifield 7.1%
Nokomis Capital 5.7%
Non-Executive Directors 4.3%
CYM 12MTH SHARE PRICE CHART
BOARD, MANAGEMENT, STRATEGIC PARTNERS
Share Price (A$)
0.045
12.0
0.040
10.0
0.035
0.030
Matt Fifield
Executive Chairman
Colin Mackey
Chief Operating Officer
Ross Bhappu
Non-Executive Director
Jeff Sommers
Chief Financial Officer
Gary Comb
Non-Executive Director
Louis Chait
Chief Commercial Officer
Scott Perry
Non-Executive Director
Angus Miles
Corporate Development
& Investor Relations
David Hwang
Company Secretary
8.0
0.025
6.0
0.020
0.015
4.0
0.010
2.0
0.005
Aug-24
4
Millions
Volume (M)
Nov-24
Feb-25
CYPRIUM | AUGUST 2025 INVESTOR PRESENTATION
May-25
Aug-25
1. Trading data at 25 August 2025. Cash and debt at 30 June 2025: Cash balance A$13.7m plus A$2.5m progress payment received post quarter end; Glencore senior secured debt US$27.5m at AUD:USD 0.65.
Metals X Convertible Notes A$36.0m face value.
2. Pacific Road Capital is an affiliate of Matt Fifield who is also a Director.
CYPRIUM METALS’ PATERSON ASSETS
Cyprium Metals owns a suite of quality assets in the Paterson region of Western Australia
NIFTY COPPER COMPLEX
Status
Next
JORC Resource
JORC Reserve
Development; PFS
complete
Concentrate Project
BFS
1,038,000t copper contained 83Mt @ 0.90% Cu for
in open pit resource
753,000t copper
Cathode Project
Construction
91,000t
copper contained in existing leach pads
Status
Deposit
Total JORC Resource
Higher-grade zone
Advanced
Exploration
Large, near-surface sulphide
copper
371Mt @ 0.43% Cu using a
≥0.25% Cu cutoff for
1,595,000t
contained Cu
106Mt @ 0.67% Cu using a
≥0.45% Cu Cutoff for
712,000t contained Cu
MAROOCHYDORE
PATERSON EXPLORATION PROJECT
Status
Project
Exploration
1,938km2 of exploration tenure within the highly prospective Paterson Region
A$24m invested by IGO over 5-years to 2025, generating a high-quality data set and multiple
compelling targets
5
CYPRIUM | AUGUST 2025 INVESTOR PRESENTATION
NIFTY COPPER COMPLEX: PROLIFIC PRODUCER AT MIDLIFE
Historic mining pursued shallow oxides and very high-grade underground, leaving substantial reserves for new surface mine
220,000 Tonnes of Cathode
via Heap Leach Surface Oxides (’93-’06)
Nifty: Sedimentary-hosted Copper Orebody
500,000 Tonnes in Concentrate
from High Grade Underground (’08-’19)
1
Source: Company production records, 2024 Pre-feasibility Study, which excludes certain oxide material that may be produced and recovered from the open pit. Copper contained in stockpiles accounted for by reconciliation of historical
metallurgical accounting does not conform to JORC standards. A large portion of this material is deemed unclassified -- please refer to company announcement “Nifty Heap Leach Mineral Resource Estimate” dated 19 August 2024 for
additional information and further JORC resource and reserve figures on the following pages.
6
CYPRIUM | AUGUST 2025 INVESTOR PRESENTATION
ASSET-RICH BROWNFIELD SETS STAGE FOR RAPID RESTART
Unique opportunity to reposition a massive resource endowment through a change of mining method
2
83Mt reserve at 0.9% Cu for 750kt contained copper remains
in zone between the oxide open pit and the underground mine,
adjacent existing concentrator*
Underground workings
3
1
91,000 tonnes contained copper in above
ground stockpiles next to SX-EW plant1
Continued investment in site maintenance and compliance over time
has maintained suite of valuable permits, enabling fast redevelopment
Regulator
Current Status
Renewal /
Requirements
Works Approval
DWER
Approved
Aug-27
Native Veg. Clearing (3)
DEMIRS
Approved
Various
Mining Proposal
DEMIRS
Approved
MOP Update
Mine Closure Plan
DEMIRS
Approved
Apr-26
Water License
DWER
Approved
Apr-26
Permit
1. Copper contained in stockpiles accounted for by reconciliation of historical metallurgical accounting does not conform to JORC standards. A large portion of this material is deemed unclassified -- please refer to company
announcement “Nifty Heap Leach Mineral Resource Estimate” dated 19 August 2024 for additional information and further JORC resource and reserve figures on the following pages.
7
CYPRIUM | AUGUST 2025 INVESTOR PRESENTATION
FAST TRACK TO CASH FLOW:
RESTART COPPER CATHODE PRODUCTION
A$86m
Pre-tax NPV @ 8% - Nov 24 PFS
110%
Pre-tax IRR - Nov 24 PFS
4.2 years
Reserve life
6.2
5.4
3.9
6.0
6ktpa
Average production Cu
A$6,800
AISC A$/t pay. Cu
28
45%
PFS recovery rate
AISC US$/lb pay. Cu
US$2.18
Development capital
A$30m
Capitalised operating costs
A$16m
10Mt @ 0.41% Cu for 44 kt
(14)
(7)
39
47
35
47
57
34
45
Year 1
PFS (A$m)
Year 2
US$4.50/lbs, AUD:USD 0.65
Year 3
Year 4
US$5.00/lbs, AUD:USD 0.65
1. PFS pricing: Cu price US$4.25 / pound; AUD:USD $0.71.
NO MINING OF
ADDITIONAL ORE
OXIDE IN PIT
UPSIDE
Excluded from PFS Cathode
Potential to increase
Project economics; recent
above ground ore
cathode restarts have
reserves with excluded
encountered grade
material
management issues with oxide
and transitional ores
CYPRIUM | AUGUST 2025 INVESTOR PRESENTATION
34
39
(1)
Access to current copper price and FX environment would have material impact on short-term corporate cash
8
55
29
NIFTY SX-EW PLANT
SIMPLE, WELL-UNDERSTOOD
PROCESSING
Reprocessing of existing
heap leach pads
2.9
24kt
LOM production Cu - Reserve only
Cathode Project Ore Reserves
(44Kt contained Cu)
PRODUCTION (KT) & PRE-TAX FCF (A$M) – PFS Case
Year 5
Cu Cathode Plated (kt)
ABOVE GROUND COPPER IS STOCKPILED IN HEAP LEACH
Retreatment of existing leach pads is a low complexity, low capital path to cash flow
Drill holes data completed at partial depth determined block model
Metallurgical accounting:
17.2Mt material stacked contains 200 mmlbs of residual copper
12.4Mt JORC resource containing 119 mmlbs of copper and
10.6Mt JORC reserve containing 97 mmlbs of copper
4-year cathode reserve life has potential to be significantly extended
9
CYPRIUM | AUGUST 2025 INVESTOR PRESENTATION
1. Please refer to company announcements “Nifty Heap Leach Mineral Resource Estimate” dated 19 August 2024 and “Nifty PFS Confirms $1,129m Pre-Tax NPV and 797kt Ore Reserve” dated 27 November 2024
for additional information.
SXEW PLANT CAN BE QUICKLY AND INEXPENSIVELY REBUILT
Significant work to date shows low capital is required to refurbish plant for 6,000 ktpa operation
PFS Project Cost Estimate
Item
SX Plant (“Solvent Extraction”) requires new pumps,
motors, electrical and controls
Heap Leach
0.3
Mechanical
6.8
Electrical
6.5
Piping
3.4
Concrete & structural
2.8
Construction overheads
1.5
SX-EW Plant
21.0
Site, roads, misc
1.4
First fills
1.3
EPCM & Commissioning
2.5
Contingency
3.4
Total Capital Cost
29.9
Partial refurbishment of Electrowinning Circuit to operate
at 6,000 tpa, well below peak production of 25,000 tpa
PFS project plan being updated with execution partner Macmahon
10
CYPRIUM | AUGUST 2025 INVESTOR PRESENTATION
A$m
1. Please refer to company announcement “Nifty PFS Confirms $1,129m Pre-Tax NPV and 797kt Ore Reserve” dated 27 November 2024 for additional information.
LARGE VALUE DRIVER:
SULPHIDE OPEN PIT AND
CONCENTRATOR RESTART
CHALCOPYRITE MINERALISATION
NIFTY EXISTING CONCENTRATOR
A$1.04B
Pre-tax NPV @ 8% - Nov 24 PFS
26.3%
Pre-tax IRR - Nov 24 PFS
20 years
Project life
694 kt
LOM production Cu
Average production Cu
38.7 ktpa
AISC A$/t pay. Cu
A$8,158
COPPER IN CONCENTRATE PRODUCTION
AISC US$/lb pay. Cu
US$2.62
kt
Development capital
A$239m
50
Capitalised operating costs
A$173m
40
Concentrate Project Ore Reserves
(753Kt contained Cu)
83Mt @ 0.90% Cu for 753 kt
45
46
46
PERMITTED SITE
Major permits required
to commence
concentrator restart are
largely complete
43
41
35
34
30
44
44
39
35
35
33
28
20
22
15
10
5
-
14
12
14
3
-
FY48
FY47
FY46
FY45
FY44
FY43
FY42
FY41
FY40
FY39
FY38
FY37
FY36
FY35
FY34
FY33
FY32
FY31
FY30
FY29
FY28
FY27
-
FY26
FAVOURABLE GEOLOGICAL
MODEL
Sediment hosted copper
deposits cost effective to mine
relative to other deposit types.
Major copper producers
pursuing sediment hosted
deposits
41
39
35
25
4.5MTPA REFURBISHED AND
EXPANDED CONCENTRATOR
Optionality to refurbish existing
3.0Mtpa concentrator for capital
light path to production with
expansion to 4.5Mtpa post restart
46
Material value lever that delivers >A$1B pre-tax NPV (8%)
11
CYPRIUM | AUGUST 2025 INVESTOR PRESENTATION
1. PFS pricing: Cu price US$4.25 / pound; AUD:USD $0.71. Please refer to company announcement “Nifty PFS Confirms $1,129m Pre-Tax NPV and 797kt Ore Reserve” dated 27 November 2024 for additional information.
WE ARE EXECUTING A VERY SIMPLE PLAN AT PACE
2024 saw rebuild of information from first principles to develop forward action plan
2024
3Q
4Q
Nifty: Concentrate
Nifty: Cathode
1Q
2Q
PFS
HL MRE
Cathode FS
Cathode permit updates
4Q
1Q
2Q
Cathode Refurb / Restart
Permit updates (MOP, Closure)
Commercial / Partnerships
Glencore
MAH
Cathode Contracts
Financial
Converts and
Senior Loan
Sell Non-core Assets
Cathode Finance
Progressing Key Workstreams
3Q
BFS Concentrate
PFS
Permits/Entitlements
2026
2025
• Cathode Feasibility Plan
• Cathode Construction Financing
• Cathode Project Sanctioning & FID
• BFS
Strategic Partners
12
CYPRIUM | AUGUST 2025 INVESTOR PRESENTATION
WHERE ARE THE OTHER BIG COPPER OPPORTUNITIES?
Bastion Mining to acquire
Xanadu Mines
2.2Bt I&I Resource @ 0.21% Cu, 0.15 g/t Au
A$ 160m
Kinterra to acquire
New World Resources
14Mt M,I&I Resource @ 3.8% CuEq
A$ 243m
2025
2025
MACH acquires
REX Minerals
BFS-stage 40ktpa surface mine
A$ 393m
Sumitomo earns into
30% of Winu
222Mt M&I resource @ 0.45% Cu+Au
A$ 599m
Harmony buys
Eva Copper
BFS-stage 40ktpa surface mine
US$ 230m
2024
2024
2022
Harmony Gold to acquire Metals
Acquisition Corp
45ktpa copper production, 15 yr life for
US$ 1.03bn
PRODUCERS
DEVELOPERS
Selected recent transactions show that Australian developers and producers with scale and longevity have material strategic value
2025
Evolution acquires remaining
Ernest Henry Cu interests
~40ktpa copper production for
A$ 1.1bn
Nifty-scale copper mines are valuable and scarce – most have already been consolidated.
13
CYPRIUM | AUGUST 2025 INVESTOR PRESENTATION
2021
MAROOCHYDORE REDISCOVERED
Globally significant copper resource in Paterson district within haul distance to Nifty
370.8Mt @ 0.43% Cu, 227 ppm Co
Inferred resources
1.595Mt contained Cu
106.3Mt @ 0.67% Cu, 308 ppm Co
Higher-grade zone within inferred
resource
84Kt contained Co @ 0.25% Cu cut-off
712Kt contained Cu
33Kt contained Co @ 0.45% Cu cut-off
14
CYPRIUM | AUGUST 2025 INVESTOR PRESENTATION
Sedimentary copper
mineralisation style
Demonstrating significant continuity of
mineralisation and resource scale, with similar
geology to nearby Nifty Copper Complex.
Higher-grade domain
Will be further studied as satellite feed operation
to Cyprium’s nearby Nifty mill and concentrator in
the Paterson district.
EQUITY RAISING DETAILS
15
CYPRIUM | AUGUST 2025 INVESTOR PRESENTATION
CAPITAL RAISING OVERVIEW
A$80.0 million institutional placement and underwritten entitlement offer to accelerate path to cashflow generation
Offer structure and size
▪ A$74 million two-tranche Institutional Placement via the issue of approximately 2,643 million new fully paid ordinary shares in Cyprium (“New Shares”) to
professional and sophisticated investors (“Placement”)
▪ A$6.0 million fully underwritten entitlement offer to existing and eligible shareholders via the issue of approximately 215 million New Shares (“Entitlement Offer”)
Offer price
▪ Offer price of A$0.028 per New Share (“Offer Price”), which represents a:
▪ 6.7% discount to the last traded price of A$0.0300 on 25 August 2025;
▪ 6.9% discount to the 5-day volume-weighted average price (“VWAP”) of A$0.0301 on 25 August 2025; and
▪ 6.4% discount to the 10-day VWAP of A$0.0299 on 25 August 2025.
Placement
▪ Two-tranche Placement to raise approximately A$74 million via the issue of approximately 2,643 million New Shares to professional and sophisticated investors,
comprising:
▪ A “Tranche 1 Placement” to raise approximately A$14.4 million via the issue of approximately 516 million New Shares within Cyprium’s existing placement
capacity under Listing Rule 7.1 and 7.1A; and
▪ A “Tranche 2 Placement” to raise approximately A$59.6 million via the issue of approximately 2,127 million New Shares, including to certain Directors, subject
to shareholder approval at an Extraordinary General Meeting (“EGM”) to be held on or around 6 October 2025
▪ Cyprium intends to undertake a 1-for-9.6 pro-rata Entitlement Offer, which is fully underwritten, to existing eligible shareholders via the issue of approximately 215
million New Shares to raise approximately A$6.0 million
Director Participation
▪ Cyprium Directors and key management personnel intend to participate in the Placement for an aggregate of A$1.0 million. Director participation is subject to
shareholder approval at an EGM to be held in or around 6 October 2025 and be allotted under the second tranche of the Placement
Cornerstone Investment
▪ ~A$42m committed by cornerstone investors Flat Footed, Tribeca Investment Partners and Tanito Group into Tranche 2 Placement
Use of Proceeds
Ranking
Lead Managers
Share consolidation
16
▪ Funds raised will be used to execute the phase one Cathode Project, materially strengthen the balance sheet, complete the feasibility study for the Concentrate
Project and maintain the Company’s extensive asset base in the Paterson Province
▪ All New Shares issued under the Capital Raising will rank equally with existing shares on issue
▪ Wilsons Corporate Finance Limited is acting as Financial Advisor and Joint Lead Manager to the Placement. Canaccord Genuity (Australia) Limited and Euroz
Hartleys Limited are acting as Joint Lead Managers to the Placement. Wallabi Group are acting as Co-Manager to the Placement
▪ Cyprium intends to undertake a 1-for-10 share consolidation, subject to shareholder approval at an EGM to be held in or around 6 October 2025
SOURCES AND USES OF FUNDS
Funding to accelerate path to cashflow generation
Sources & Uses of funds
Uses of funds
A$m
Restart of the Company’s SXEW plant (Heap Leach, Mechanical, Electrical, Piping, Concrete and structural, Construction overheads)
21.0
Other supporting infrastructure for cathode restart (site, roads, first fills, EPCM & contingency)
9.0
Activities relating to cathode restart
10.0
Additional funds for operations, project development, debt reduction & costs of the offer
40.0
Total Uses
80.0
Sources of funds
A$m
Tranche 1 Placement
14.4
Tranche 2 Placement
59.6
Entitlement Offer (fully underwritten)
6.0
Total Sources
80.0
Note: Sources and uses of funds are indicative and may change at the Company’s discretion.
17
PRO FORMA CAPITAL STRUCTURE
Transformational funding solution to accelerate growth
Current
(Pre-Raise)
Pro-Forma
(Post-Raise)7
Shares on issue (CYM:ASX)
2,064m
4,922m
Share price / Offer price
A$0.0301
A$0.028
Market capitalisation
A$61.9m
A$137.8m
Cash
A$16.2m2
A$96.2m3
Senior Debt
A$42.3m4
A$42.3m5
Convertible Note6
A$36.0m
A$36.0m
Net Debt / (Cash)
A$62.1m
(A$17.9m)
Enterprise Value
A$124.0m
A$119.9m
Capital Structure
1.
2.
3.
4.
5.
6.
7.
18
Close as at 25 August 2025.
Cash as at 30 June 2025, comprises A$13.7m plus A$2.5m progress payment received post quarter end.
Placement and Entitlement Offer proceeds before costs.
Senior Debt as at 30 June 2025.
Excludes any debt reduction from proceeds.
Metals X Convertible Notes A$36.0m face value.
Post Placement & Entitlement Offer, pre consolidation.
INDICATIVE TIMETABLE
Summary of key dates
Event
Indicative Time / Date (2025)
Trading Halt
Tuesday 26 August
Trading halt lifted, announce Placement and Entitlement Offer
Thursday 28 August
Entitlement offer Record Date
Settlement of New Shares under Tranche 1 of the Placement
Allotment and Quotation of New Shares under Tranche 1 of the Placem